Loading...
2235 E SOUTH REDWOOD DR (2)Permit Types BLD ELE MEC PLM X Permit Number: BLD2023-02828 Issued: 06/07/2023 www.anaheim.neUbu ilding (714)765-0626 Quarter Section: 112 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. 1714)765-5153 Site Address: 2235 E SOUTH REDWOOD DR, ANAHEIM, CA 92806 Legal Description: N TR 2492 BLK LOT 14 APN:08338003 Project Description: Reroof: Remove existing to install (28) sq of composition shingles over entire house and attached garage Living Area: Number of Stories: 2 Valuation: 20,000.00 Garage Area: Construction Types: N/A Carport Area: Occupancy Groups: Balcony / Deck Area: Fire SprinNered: Cool Roof: Total Fees paid for Permit: 341.60 People Associated with Project: Owner STORER, TAMBRA J TR 2235 S REDWOOD DR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty' The permit shall expire by limitation and become null and void H the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. P�Pt1EIM C. Cityof Anaheim o� �O Building Division F y U > OECD) $h1 Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fin; Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COAIMigation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been�Z sinned:Building Final (714 765-5153) Last Inspection-Final Only After Above Completed I Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) ti 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' ed• 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections Iear i Diaphragm/Frame) Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) . Grease Interceptor Sewer Watei Engineering Backflow (Testable Only) Water Service