Permit Number: BLD2023-02828
Issued: 06/07/2023
www.anaheim.neUbu ilding
(714)765-0626
Quarter Section: 112
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
1714)765-5153
Site Address: 2235 E SOUTH REDWOOD DR, ANAHEIM, CA 92806
Legal Description: N TR 2492 BLK LOT 14
APN:08338003
Project Description: Reroof: Remove existing to install (28) sq of composition shingles over entire house and attached garage
Living Area: Number of Stories: 2 Valuation: 20,000.00
Garage Area: Construction Types: N/A
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire SprinNered:
Cool Roof: Total Fees paid for Permit: 341.60
People Associated with Project:
Owner STORER, TAMBRA J TR 2235 S REDWOOD DR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty'
The permit shall expire by limitation and become null and void H the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�Pt1EIM C.
Cityof Anaheim o� �O
Building Division F y
U >
OECD) $h1
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fin; Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been�Z
sinned:Building
Final (714 765-5153)
Last Inspection-Final Only After Above Completed
I
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
ti
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s' ed•
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
Iear
i Diaphragm/Frame)
Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.) .
Grease Interceptor
Sewer
Watei Engineering Backflow (Testable Only)
Water Service