Loading...
2540 E SANDALWOOD CT (6)Permit Types BLD ELE MEC PLM X Permit Number: BLD2022-04945 Issued: 10/18/2022 www.anaheim.net/building (714)765-0626 Quarter Section: 111 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765.5153 Site Address: 2540 E SANDALWOOD CT, Anaheim, CA 92806 Legal Description: S TWP 4 RGE 10 SEC 1 T 4 R 10 SEC 1 POR SWI/4 APN:26824188 Project Description: Mechanical to change out air conditioner located in the backyard, (1) furnace and (1) coil. Living Area: Number of Stories: 1 Valuation: 0.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 217.00 People Associated with Project: Permit Applicant Ben Medina Owner GOMEZ HILDA CORZO 2540 E SANDALWOOD CT Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures City Compressor/Boller - up to 15 hp 1 Heating Appliances, Including vent 1 Heating/Cooling Coil 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. w City of Anaheim Building Division Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final phimhinn Final / Connection Control (714) 765-4280 !eying Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' e • Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' e 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Struct., Ele., or Mec.) Grease Interceptor (Da not backfill unless senned ofn Sewer Water Engineering Backflow (Testable Only) Water Service