2662 E SYCAMORE ST (5)Permit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023-00114
Issued: 01/11/2023
www.anaheim.net/building
(714)765-0626
Quarter Section: 122
CITY OF ANAHEIM
Site Address: 2662 E SYCAMORE ST; ANAHEIM, CA 92806
Legal D si riptlon:. N TR 3614 BLK LOT 18
APN:26830306
Project Description: Plumbing for whole house PEX repipe.
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 - 5153
Living Area: Number of Stories: 1 Valuation: 0.00
Garage Area: Construction Types: NIA
carport Area: Occupancy Groups:
Balcony I Deck Area: Fire Sprinidered:
Cool Roof: Total Fees paid for Permit: 167.00
People Associated with Project:
Permit Applicant logan appal
Owner BOYKIN JOSEPH ALEX SR 2662 E SYCAMORE ST
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Water Distribution 1
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
P�PHEIl19 CqC
City of Anaheim o4 io
Building Division F z
17) a
DEC)
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE INSPECTOR
All applicable items below must be
signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (All4w
10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Con
pleted
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been soaned7
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Ma einf./Bond Beam/Pre-Grout)
ou lumbing (Top Out)
Rough Duc echanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow, (Testable Only)
Water Service