2811 E SOUTH STThe permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
Permit Types
'ELE
CITY OF ANAHEIM
BLD I MEC PLM
X
BUILDING DIVISION
Permit Number: BLD2023-02602
200 S. ANAHEIM BLVD.
Issued: 05/25/2023
17141765 - 5153
www.anaheim.net/building
(714)765-4626
Quarter Section: 134
Site Address: 2811 E SOUTH ST, ANAHEIM, CA 92806
Legal Description: N TR 4096 BLK LOT 2
APN:25330429
Project Description: Residential EV Charger Level 2
Living Area: Number of Stories: 0
Valuation: 0.00
Garage Area:
Construction Types: NIA
Carport Area:
Occupancy Groups:
Balcony I Dock Area:
Fire Sprinldered:
Cool Roof:
Total Fees paid for Permit: 167.00
People Associated with Project:
Permit Applicant Duke Nguyen
Owner NGUYEN, DUKE P TR D P
2811 E SOUTH ST
Type Electrical Fixtures Qty Type
Plumbing Fixtures
Qty Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�PM►EIAj cq<
Cityof Anaheim D� io
Building Division F z
u a
DED �$�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE' INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s' ed•
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service