8325 E SHINING STAR CT (3)Permit Types
BLD ELE MEC PLM
X X
Pennit'Number: BLD2023-01352
Issued: 05/26/2023
www.anaheim.neUbuilding
(714)765.4626
Quarter Section: 227
CITY OF ANAHEIM
Site Address-. 8325 E SHINING. STAR CT, ANAHEIM, CA 92808
Legal. Description: NIR X13987 BLK LOT 6
APN: `35459106
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Photovoltaic System: Install residential roof mounted solar system with (20) modules, (1) inverter, (1) 225A load
center, and (1) E.S.S.
Living Area:
Number of Stories:
2 Valuation: 17,8110.110
Garage Area:
Construction Types. WA
Carport Area:
Occupancy Groups:
Balcony / Deck Area:
Fire Sprinldered: No
Cool Roof:
Total Fees paid for Pemnih 626.31
People Associated with Project:
Contractor TESLA ENERGY OPERATIONS INC
901 PAGE AVE200809171020478510 FREMONT, CA 92606
Permit Applicant Adele Metendrez
Owner ZHANG YANBIN
8325 E SHINING STAR CT
Engineer - Civil PHILIP WU
15106 NW COSMOS PORTLAND, OR 97229
Type Electrical Fixtures
Qty Type
Plumbing Fixtures Qty Mechanical Fixtures ally
Generators/Transformers -1 to 10 hp,1
1
to 75 kva.
Inverter
1
Sub Panel/Temp Pwr - Under 600 V, over
1
200 amps to 500 amps
The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
City of Anaheim
Building Division
Do not occupy this building until the final inspections have been made.
INSPECTION DATE INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
si ned:
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been si ned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Mo not backfill unless sinned ofn
Sewer
Water Engineering Backflow (Testable Only)
Water Service
FINAL INSPECTIONS DATE I INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final li
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765.4591
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
COAIMigation Measures
Building Final (714 765-5153) ApES
Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections