Permit Number: BLD2023-03092
Issued: 09/21/2022
www.anaheim.net/building
(714)765-0626
Quarter Section: 202
Site Address: 185 S TRISH CT, ANAHEIM, CA 92808
Legal Description: N TR 12619 BLK LOT 5
APN:35622172
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(7141765.5153
Project Description: Residential Remodel: Remove (2) windows, install (1) nail -fin window and reduce size of (1) nail -fin window. Install
non -load bearing partion wall(s) to frame a wine cooler, section of pantry, and bathroom walk-in closet. Re -tile (4) showers with electrical,
mechanical, and plumbing fixture upgrade(s).(REF#: BLD2016-02574)
Living Area:
Number of Stories:
2 Valuation:
50,000.00
Garage Area:
Construction Types:
VB
Carport Area:
Occupancy Groups:
Balcony I Deer Area:
Fire Sprinklered:
Yes
Cool Roof.
Total Fees paid for Permit:
105.00
People Associated with Project:
Permit Applicant Joseph Le Torre
Owner LA TORRE, JOSEPH
185 S TRISH CT
Type Electrical Fixtures
Qty Type Plumbing Fixtures
Qty Mechanical Fixtures
Qty
Receptacle, switches, lights
26 Bar Sink
1 Ventilation Fan - — 300 cfm on single duct
3
Bath Tub
3
Dishwasher
2
Garbage Disposal
1
Kitchen Sink
1
Lavatory
5
Shower
2
Washing Machine Rough
1
Water Closet
5
The permit shall expire by limitation and become null and vold If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�pHEIM ��<
City of Anaheim o� io
Building Division F z
U >
�DGNDEO �$h�
Do not occupy this buildinq until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
si e •
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
/
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspections
r 'C 1\rtc k5 \me,
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
"p C 'qV\. RIA, 4t, rh�(,
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbinq Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)