Loading...
951 E TWILL CTPermit Types BLD ELE MEC PLM X Permit -Number: BLD2023-01200 Issued: 03/14/2023 www.anaheim.net/building (714)765-0626 Quarter Section: 109 CITY OF ANAHEIM BUILDING DIVISION •200.8. ANAHEIM BLVD. (714) 765 -5153 Site. Address:. 951 E TWILL CT, Anaheim, CA 92802 ;Legal;DescrJption. N TR :17920 BLK LOT 1 UN 70 LOT 1 OF TRACT 17920 OF r., as ..:... . 'APN:93206470 Project Description: Residential EV Charger Level 2 :FV MUNE ,#Jr&3/IqJ23 Living Area: Number of Stories: Valuation: 0.00 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Sprinldered: Cool Root Total Fees paid for Permit: 0.00 People Associated with Project: Contractor OC ELECTRIC 17052 CARLANN CIR APT A TUSTIN, CA Permit Applicant Ruben Padilla 17052 Carlann Cir Apt A Tustin, CA 92780 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit Is required to commence or continue work. � � r Citof Anaheim PSP"ErM C,yC' FINAL INSPECTIONS DATE INSPE�iOR Y 04 O All applicable items below must be signed before utilities are released Building Division r i Final Gas Test U > Electrical Final Plumbing Final �DGNDED Mechanical Final Cross Connection Control (714) 765-4280 Do not occupy this building until the final inspections have been made. Engineering Final (714) 765-5126 INSPECTION I DATE INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sionedm Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been s' 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Insnections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Constructoo Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor (Do not hackfill un' Sewer Water Engineering Backflow (Testable Only) Water Service