3102 W TYLER AVE (3)Permit Types
BLD ELE MEC PLM
X I X
Permit Number: BLD2018-02688
Issued: 06/25/2018
INSPECTION REQUEST LINE:
(714) 765'- 4626
Quarter Section: 8
:.Mte:.Address:3102 .W TYLER AVE
Legal Di scription:1820 LOT 61
Project Description: Residential Photovoltaic with 15 Micro -inverters
NlIM Cit / _ W
CITiY OFA AHEIM
200 S-NANAHEIMOBLVD.
(714) 765 - 5153
Valuation:
$7,500.00
Construcion Types:
N/A, ,
Fire Sprinklered?
No
Cool Roof
No
Total Fees paid for Permit:
147.67
People Associated with Project:
Permit Applicant PAUL LE
Owner ABUBACO MACH 3102 W TYLER AVE ANAHEIM CA 92801-6038
Contractor S W S S ELECTRICAL 13752 HARBOR BLVD GARDEN GROVE CA 92843
Type Electrical Fixtures
Micro Inverter
Qty Type
15
Plumbing Fixtures
Qty Type
Mechanical Fixtures
Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbld_permit_combo
P�PNEIAJ Cqf
City& Anaheim D� io
Building Division z
U >
DED %ah^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765.4280
Engineering Final (714) 765-5126
INSPECTION I DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765.4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinned:
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been s*anedi
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Strutt., Ele., or Mec.)
Grease Interceptor
(Do not b2ckfill unless sinned ofn
Sewer
Water Engineering Backflow (Testable Only)
Water Service