5556 E VISTA DEL ESTEPermit Typ_e_s_
BLD ELE I MEC PLM
X
Permit Number: BLD2023-02297
Issued: 05/10/2023
CITY OF ANAHEIM
www.anaheim.net/building
(714)765.4626
Quarter Section: 186
Site Address: 5556 E VISTA DEL ESTEANAHEIM, CA 92807
Legal Description: N TR 8404 BL'K LOT 88
APN:36326307
Project Description: Residential EV Charger Level 2
Living Area: Number of Stories:
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof:
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 76S - S1S3
People Associated with Project:
Permit Applicant Daniel J. W.Park
Owner KIM, MARIA 5556 E VISTA DEL ESTE
0 Valuation: 0.00
Construction Types: NIA
Occupancy Groups:
Fire Sprinidered:
Total Fess paid for Permit: 167.00
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
City of Anaheim
Building Division
Do not occupy this buildino until the final inspections have been made.
INSPECTION DATE I INSPECTOR
Do not pour concrete until the following applicable items have been signed:
Plumbing (Ground/Underfloor Drain Waste)
Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
sinnad-
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf.IBond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COAIMitagation Measures
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service
FINAL INSPECTIONS DATE INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
Fire Sprinkler (ONLY) (714) 765-5041
Fire Dept. Final (714) 765-5041
Water Engineering (714) 765-4591
Sub ListlBus. Lic. (714) 765-5194 (Allow, 10 business days)
COAIMigation Measures
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
PARTIAL INSPECTIONS
Building Inspections
Mechanical Inspections
Plumbing Inspections
Electrical Inspections