Loading...
905 N WEST ST (2)Permit Types BLD ELE MEC PLM X I X X X Permit Number: BLD2016-02524 Issued: 03/12/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 61 Site Address: 905 N WEST ST Legal Description: P BK 40 PG 15 PAR 1 o4 t o` �o CIHE-IM BUIL-DING�DIVISI ON 200 S. AHEI D. (714) 765 - 5153 Project Description: ADU - Residential Addition: 800 s.ft Convert existing detached garage to habitable space with (2) bedrooms, (2) bathrooms, kitchen and living room for accessory dwelling unit. Remove and replace (2) existing windows (retrofit) and convert (1) existing door to retrofit window. 800 s.f. of stucco replacement. Work done prior to obtaining permit. REF:INV2017-00534 Living Area: 800 Valuation: $15,000.00 Construcion Types: N/A, , Fire Sprinklered? No Cool Roof No Total Fees paid for Permit: 3,171.76 People Associated with Project: Owner CHASTEN BOWEN 907 N WEST ST ANAHEIM CA 92801-4364 Engineer ALEX C LEE Engineer SCOTT R BELAIR Permit Applicant ARON BOWEN Type Electrical Fixtures Sub Panel/Temp Pwr - < 600 V, 0 < amps — 200 Receptacle, switches, lights 5082 BOLSA AVENUE SUITE 101 HUNTINGTON BEACH CA 92649 760 N. EUCLID ST. #210 ANAHEIM CA 92801 1208 W NORTH ST ANAHEIM CA 92801 Qty Type Plumbing Fixtures Qty 1 Bath Tub 2 Lavatory 1 48 Water Closet 2 Kitchen Sink 1 Garbage Disposal 1 Repair/Drainage Alteration/Vent Piping 1 Water Heater 1 Water Distribution 1 Type Mechanical Fixtures Qty Ventilation Fan - <= 300 cfm on single duct 2 Heating Appliances, including vent 1 Gas System (1-5 outlets) 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. fbid_permit combo P�pHEIM c9< City of Anaheim o� �O Building Division i u a �DUNDED �$y^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test �a Electrical Final Plumbing Final Mechanical Final \ Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) q N f JsG Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA(Migation Measures Do not install subfloor or pour floor slab until the foliwing applicable items have been sionedn Building Final (714 765-5153) Last Inspection -Final Only After Above Completed bb d� 8 p W C Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been 1st Floor Shear JSf✓ Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) N J� Rough Duct (Mechanical) Rough Mechanical Rough Electrical 9 3 Rough COAIMitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mac. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall 40* W G Drywall Penetrations (Ele, Mac & Plbg) Interior Lath Exterior Lath �� i7a0 J SG Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days atter approval) Excludes New Construction Exterior Plaster (Brown Coat) S ao JSG T -Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service