905 N WEST ST (2)Permit Types
BLD ELE MEC PLM
X I X X X
Permit Number: BLD2016-02524
Issued: 03/12/2018
INSPECTION REQUEST LINE:
(714) 765 - 4626
Quarter Section: 61
Site Address: 905 N WEST ST
Legal Description: P BK 40 PG 15 PAR 1
o4
t
o` �o
CIHE-IM
BUIL-DING�DIVISI ON
200 S. AHEI D.
(714) 765 - 5153
Project Description: ADU - Residential Addition: 800 s.ft Convert existing detached garage to habitable space with (2)
bedrooms, (2) bathrooms, kitchen and living room for accessory dwelling unit. Remove and replace (2) existing windows
(retrofit) and convert (1) existing door to retrofit window. 800 s.f. of stucco replacement. Work done prior to obtaining permit.
REF:INV2017-00534
Living Area: 800 Valuation: $15,000.00
Construcion Types: N/A, ,
Fire Sprinklered? No
Cool Roof No
Total Fees paid for Permit: 3,171.76
People Associated with Project:
Owner CHASTEN BOWEN 907 N WEST ST ANAHEIM CA 92801-4364
Engineer ALEX C LEE
Engineer SCOTT R BELAIR
Permit Applicant ARON BOWEN
Type Electrical Fixtures
Sub Panel/Temp Pwr - < 600 V, 0 < amps
— 200
Receptacle, switches, lights
5082 BOLSA AVENUE SUITE 101 HUNTINGTON BEACH CA 92649
760 N. EUCLID ST. #210 ANAHEIM CA 92801
1208 W NORTH ST ANAHEIM CA 92801
Qty Type Plumbing Fixtures Qty
1 Bath Tub 2
Lavatory 1
48 Water Closet 2
Kitchen Sink 1
Garbage Disposal 1
Repair/Drainage Alteration/Vent Piping 1
Water Heater 1
Water Distribution 1
Type Mechanical Fixtures Qty
Ventilation Fan - <= 300 cfm on single duct 2
Heating Appliances, including vent 1
Gas System (1-5 outlets) 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance. A new permit is required to commence or continue work. fbid_permit combo
P�pHEIM c9<
City of Anaheim o� �O
Building Division i
u a
�DUNDED �$y^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test �a
Electrical Final
Plumbing Final
Mechanical Final \
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION
DATE I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
q N f JsG
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub LisUBus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA(Migation Measures
Do not install subfloor or pour floor slab until the foliwing applicable items have been
sionedn
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
bb d�
8
p
W C
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildinq Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been
1st Floor Shear
JSf✓
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
N J�
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
9 3
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mac. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
40*
W G
Drywall Penetrations (Ele, Mac & Plbg)
Interior Lath
Exterior Lath
�� i7a0
J SG
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days atter approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
S ao
JSG
T -Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service