Loading...
1700-1720 N WILLOW WOODS DR (2)Permit Types BLD ELE MEC PLM X - Permit Number: BLD2018-04494 Issued: 10/02/2018 INSPECTION REQUEST LINE: (714) 765 - 4626 Quarter Section: 177 Site Address: 1700-1720. N WILLOW WOODS DR Legal Description: F Project Description: Residential Remodel: Repair 100 sq ft of stucco. (Units A -D) People Associated with Project: EIM Valuation: Construcion Types: N/A, , Total Fees paid for Permit: 297.00 Owner Contractor INFINITY CONSTRUCTION 1610 N ROSEWOOD AVE SANTA ANA CA 92706 0000 Permit Applicant GABRIEL TAPIA Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to'commence or continue work. fbld_permit_combo PSI+ �qC City of Anaheim c� "EIM io Building Division i U a �CGNDED 1 Do not occupy this buildina until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765.4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/FormsITranches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been s' ed: Building Final (714 765-5153) Last Inspection-Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildina Ins ections C Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders)It ' -% •• Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) INJ 0 r t• 2nd Floor (Floor Nailing) ni n T i1 n p A f1 /! Do not cover or conceal the work below until the following applicable items have been e • 1 14 W 9 W%,f IV I r 1st Floor Shear M 2, Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (ReinElBond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. &Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Strutt., Ele., or Mec.) Grease Interceptor (Do not backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service