Loading...
2520 E WHIDBY LN (3)Permit Types BLD ELE MEC 'PLM X Permit Number: BLD2022-04452 Issued: 09/19/2022 www.anaheim.net/building (714)765-4626 Quarter Section: 125 Site Address: ;2520 E WHIDBY LN, ANAHEIM, CA 92806 Legal Description::N TR'6496 BLK•LOT 4 APN:25307136 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 - 5153 I� J l aril /; I i- Project Description: Reroof: Remove existing material, and install (29) squares of composition shingles for the house and attached garage Living Area: Number of Stories: 1 Valuation: 12,000.00 Garage Area: Construction Types: NIA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spdnldered: Cool Roof: Total Fees paid for Permit: 341.56 People Associated with Project: Permit Applicant Andres Nava Owner NAVA ANDRES TR 2520 E WHIDBY LN Type Electrical Fixtures City Type Plumbing Fixtures Qty Mechanical Fixtures City a The permit shall expire by limitation and become null and void If the building or work has not passed final Inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�PHEIIN �q< Cityof Anaheim D� io Building Division F z u > �DGNDED fah^ Do not occupy this buildinq until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground ElectrodelUfer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sioneda Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Buildinq Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been Mane& 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor ar o (Sheathin)?iaphragm/Frame) 9— Masonry(Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T -Bar (Strutt., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service