Loading...
6212 E WOODSBORO AVE (2)- Permit Types SLb ELE MEC PLM X X Permit Number: BLD2022-05587 Issued: 11/23/2022 www.anaheim.nat/building (714)765-1626 Quarter Section: 190 d CITY OF ANAHEIM BUILDING DIVISION fw n e 200 S. ANAHEIM BLVD. (714)765.5153 V Site Address: 6212 E WOODSBORO AVE, ANAHEIM, CA 92807 Legal Discrlptlon: N TR 7449.BLK LOT 75 11PN: 34942113 Project Description: Residential Photovoltaic System with Inverters �51 Living Area: Number of Stories: Valuation: 32,074.85 Garage Area: Construction Types: Carport Area: Occupancy Groups: Balcony / Dock Area: Fire Sprinklered: Cool Roof: Total Fees paid for Permit: 167.00 People Associated with Project: Permit Applicant Maggie Matthews Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Inverter 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit Issuance. A new permit is required to commence or continue work. P�Pt1EIM C9C Cityof Anaheim D� io Building Division i u > �DG�►DED �$h^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final a� Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer '00.31 T1W Sub ListlBus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been Building Final (714 765-5153) Last Inspection-Final Only After Above Completed I Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned7 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COAIMitagation Measures Plumbinq Inspections Framing (Only after Plbg., Ele., Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service