Loading...
6218-6222 E CORAL CIRPermit Types MEC PLMBLDELE /X Permit Number:BLD2021-01407 Issued:03/30/2021 INSPECTION REQUEST LINE: (714)765-4626 Quarter Section:199 CITY OF ANAHEIM BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Site Address:6218-6222 E CORAL CIR Legal Description:N TR 10973 LOT 9 Project Description:Reroof:Tear off existing materiai and replace with 5,400 sq.ft.of composition shingies over buiiding. $9,000.00Valuation: Construcion Types: Total Fees paid for Permit: N/A, 406.17 People Associated with Project: 6218 E CORAL CIR ANAHEIM CA 92807-4860 9281 LARKSPUR DR WESTMINSTER CA 92683 0000 THOMAS A KOBELOwner Contractor Permit Applicant CERTIFIED ROOFING SPECIALISTS JOSE VAZQUEZ QtyMechanicalFixturesQtyTypeQtyTypePlumbingFixturesElectricalFixturesType The permit shall expire by limitation and become null and void If the buiiding or work has not passed final inspection 365 days from the date of fbid permit combopermitissuance.A new permit is required to commence or continue work. FINAL INSPECTIONS DATE INSPECTORCityofAnaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork)PARTIAL INSPECTIONS Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the follovwng applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &Plbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor iPo !VJI un’c-£.£S'cneo clli Sewer Water Engineering Backflow (Testable Only) Water Service