6218-6222 E CORAL CIRPermit Types
MEC PLMBLDELE
/X
Permit Number:BLD2021-01407
Issued:03/30/2021
INSPECTION REQUEST LINE:
(714)765-4626
Quarter Section:199
CITY OF ANAHEIM
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Site Address:6218-6222 E CORAL CIR
Legal Description:N TR 10973 LOT 9
Project Description:Reroof:Tear off existing materiai and replace with 5,400 sq.ft.of composition shingies over buiiding.
$9,000.00Valuation:
Construcion Types:
Total Fees paid for Permit:
N/A,
406.17
People Associated with Project:
6218 E CORAL CIR ANAHEIM CA 92807-4860
9281 LARKSPUR DR WESTMINSTER CA 92683 0000
THOMAS A KOBELOwner
Contractor
Permit Applicant
CERTIFIED ROOFING SPECIALISTS
JOSE VAZQUEZ
QtyMechanicalFixturesQtyTypeQtyTypePlumbingFixturesElectricalFixturesType
The permit shall expire by limitation and become null and void If the buiiding or work has not passed final inspection 365 days from the date of
fbid permit combopermitissuance.A new permit is required to commence or continue work.
FINAL INSPECTIONS DATE INSPECTORCityofAnaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signed Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)PARTIAL INSPECTIONS
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the follovwng applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &Plbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
iPo !VJI un’c-£.£S'cneo clli
Sewer
Water Engineering Backflow (Testable Only)
Water Service