130 S DELANO STPermit Types
BLC>ELE MEC PLM
X X X L-tlPermitNumber:BLD2020-04660
Issued:03/08/2021
i.-●
CITYiOIO^ftHEIM
BUILDING DIVISION
200 S.ANAHEIM BLVD.
INSPECTION REQUEST LINE;
(714)765 -4626
Quarter Section;9 {714)765-5153
Site Address:130 S DELANO ST
Legal Description:N TR 4230 LOT 25
Project Description:Repair:Replace damaged beam and stud wall at garage's #2 and 3,450 sq ft of drywall,damaged
electrical and water heaters.REF 1NV2020-00326
$15,000.00
VB,,
Valuation:
Construcion Types:
Fire Sprinklered?
Total Fees paid for Permit:
No
1,826.95
People Associated with Project:
P O BOX 4105 DOWNEY CA 90241-1105
180 MAIN ST STE 201 TUSTIN CA 92780
11779 CARDINAL CIR GARDEN GROVE CA 92843 0000
BOB C HAMMON TROwner
HANS C HANSEN
ROBERT'S CONSTRUCTION
Engineer
Contractor
QtyMechanicalFixturesQtyTypePlumbingFixturesQtyTypeElectricalFixturesType
210WaterHeaterReceptacle,switches,lights
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance.A new permit is required to commence or continue work.fbld_permit_combo
DATE INSEECTOR1—
All applicable items below must be signed Defore uilllUes arts raleasgU
FINAL INSPECTIONSCityofAnaheim
Building Division Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have boon made Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Electrical Ground Electrode/Ufer Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
saasd. Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)PARTIAL INSPECTIONS
Building lnspectionPER{\/||y EXPIRED
INSPECTION—
NOT COMPLETED
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
dttte:72ndFloor(Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Firesprinkler (Rough)(Fire Dept.)Mechanical Inspections
2nd Floor Shear
Roof (Sheathlng/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures Plumbing Inspections
Framing (Only after Plbg,,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &Plbg)
Interior Lath
Exterior Lath Electrical Inspections
Electrical Service Meter-(Meterwill be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
i-,t ['ir-Hill in'.-.Jill
Sewer
Water Engineering Backflow (Testable Only)
Water Service