69R-090RESOLUTION NO. 69R- 90
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF ANAHEIM AMENDING RESOLUTION
NO. 68R -745 GRANTING CONDITIONAL USE
PERMIT NO. 1065.
WHEREAS, the City Council did, on the 3rd day of
December, 1968, adopt Resolution No. 68R -745 granting Conditional
Use Permit No. 1065 permitting the establishment of an inter-
national trade center with markets, hotels, restaurants, a
culture center, commercial office buildings, and other related
uses, on the property therein described, subject to certain
conditions set forth in said resolution; and
WHEREAS, the City Council does deem it proper to
revise the conditions set forth in said resolution and to
permit the property to be developed in a series of phases or
steps; and
WHEREAS, it is the intent of the City of Anaheim to
work with the developer and the developer's architect and
engineering staff to study the proposed extension of Pacifico
Avenue jointly to determine whether Pacifico Avenue should be
extended according to the best interests of the citizens of
the City of Anaheim.
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Anaheim that Resolution No. 68R -745 granting
Conditional Use Permit No. 1065 be, and the same is hereby,
amended by revising the conditions to allow the development
of said property in phases. Said revised conditions shall read
as follows:
PHASE I (Located generally at the southwest corner of Pacifico
and State College Boulevard)
1. That the owner(s) of subject property shall deed to the
City of Anaheim a strip of land 45 feet in width from
the centerline of the street, along Pacifico Avenue,
including corner returns, from the centerline of State
College Boulevard to a point approximately 665 feet west
thereof.
2. (a) That all engineering requirements of the City of
Anaheim along State College Boulevard and Pacifico Avenue,
including preparation of improvement plans and installation
of all improvements, such as curbs and gutters, sidewalks,
street grading and paving, drainage facilities, or other
appurtenant work shall be complied with as required by the
City Engineer and in accordance with standard plans and
specifications on file in the Office of the City Engineer;
and (b) that a bond in an amount and form satisfactory to
the City of Anaheim shall be posted with the City to
guarantee the installation of said engineering requirements.
3. That the owner(s) of subject property shall pay to the
City of Anaheim the sum of $2.00 per front foot, along
State College Boulevard and the easterly portion of
Pacifico Avenue, for street lighting purposes.
4. That the owner(s) of subject property shall pay to the
City of Anaheim the sum of 15 per front foot along
State College Boulevard and the easterly portion of
Pacifico Avenue, for tree planting purposes.
5. That trash storage areas shall be provided in accordance
with approved plans on file in the Office of the Director
of Public Works and Superintendent of Streets.
6. That fire hydrants shall be installed as required and
determined to be necessary by the Chief of the Fire
Department.
7. That all air conditioning facilities shall be properly
shielded from view.
8. That the owner(s) of subject property shall submit to the
City of Anaheim an irrevocable offer of dedication for the
extension of Pacifico Avenue through subject property from
a point approximately 665 feet west of the centerline of
State College Boulevard to a point approximately 660.34
feet east of the centerline of Lewis Street; said offer
to include both the north and south halves of Pacifico
Avenue, each half being 45 feet in width as measured from
the centerline. That the owner(s) of subject property
shall also submit to the City of Anaheim an agreement
in a form satisfactory to the City Attorney, agreeing to
comply with all engineering requirements, including
preparation of improvement plans and installation of all
improvements, such as curbs and gutters, sidewalks, street
grading and paving, drainage facilities, or other appurtenant
work as required by the City Engineer and in accordance
with standard plans and specifications on file in the
office of the City Engineer, at such time as required by
the City Engineer.
9. That subject property be developed in accordance with the
site development standards of the C -R, Commercial- Recreation
Zone.
10. That Conditions Nos. 1, 2(b), 3, 4 and 8 above mentioned
shall be complied with prior to the issuance of a building
permit.
11. That Conditions Nos. 5, 6 and 7 shall be complied with
prior to final building and zoning inspections.
PHASE II (Located generally at the southeast corner of Anaheim
Boulevard and Pacifico Avenue)
1. That the owner(s) of subject property shall deed to the
City of Anaheim a strip of land 45 feet in width from the
centerline of the street along Pacifico Avenue, including
corner returns, from a point approximately 660.34 feet
east of Lewis Street to the westerly property line, for
street widening purposes.
2. That the owners) of subject property shall deed to the
City of Anaheim a strip of land 64 feet in width for the
extension of Lewis Street from Pacifico Avenue to Anaheim
Boulevard on an alignment satisfactory to the City Engineer,
or that said owner(s) shall submit to the City of Anaheim
an irrevocable offer of dedication for the extension of
Lewis Street.
3. That the owner(s of subject property shall deed to the
City of Anaheim a strip of land along Anaheim Boulevard
50 feet in width from the northwest corner of Phase II
southerly to the Southern Pacific Railroad right -of -way,
and 58 feet in width from the Southern Pacific Railroad
right -of -way to Orangewood Avenue.
4. (a) That all engineering requirements of the City of
Anaheim along Pacifico Avenue and Anaheim Boulevard,
including preparation of improvement plans and installa-
tion of all improvements, such as curbs and gutters,
sidewalks, street grading and paving, drainage facilities
or other appurtenant work, shall be complied with as
required by the City Engineer and in accordance with
standard plans and specifications on file in the
office of the City Engineer; and (b) that a bond in an
amount and form satisfactory to the City of Anaheim
shall be posted with the City to guarantee the installa-
tion of said engineering requirements.
5. (a) That a bond in an amount and form satisfactory to
the City of Anaheim shall be posted with the City to
guarantee the installation of all engineering requirements,
such as curbs and gutters, sidewalks, street grading and
paving, drainage facilities, or other appurtenant work,
along Lewis Street, said engineering requirements or
improvements to be installed as required for traffic
and upon demand of the City Engineer; or (b) if an
irrevocable offer of dedication is submitted to the
City of Anaheim, an agreement shall be entered into
with the City of Anaheim guaranteeing the installation
of these improvements along Lewis Street.
6. That the owners) of subject property shall pay to the
City of Anaheim the sum of $2.00 per front foot along
Anaheim Boulevard, Pacifico Avenue, and Lewis Street
(proposed both sides), for street lighting purposes.
7. That the owner(s) of subject property shall pay to the
City of Anaheim the sum of 15 per front foot along
Anaheim Boulevard, Pacifico Avenue, and Lewis Street
(proposed both sides), for tree planting purposes.
8. That trash storage areas shall be provided in accordance
with approved plans on file in the office of the Director
of Public Works and Superintendent of Streets.
9. That fire hydrants shall be installed as required and
determined to be necessary by the Chief of the Fire
Department.
10. That all air conditioning facilities shall be properly
shielded from view.
11. That subject property shall be developed in accordance
with the site development standards of the C -R,
Commercial Recreation Zone.
12. That Conditions Nos. 1, 2, 3, 4(b), 5, 6 and 7 above
mentioned, shall be complied with prior to the issuance
of a building permit.
13. That Conditions Nos. 8, 9 and 10, above mentioned, shall
be complied with prior to final building and zoning
inspections.
PHASE III (South side of Katella Avenue, west of State College
Boulevard)
1. That the owner(s) of subject property shall pay to the
City of Anaheim the sum of $2.00 per front foot along
Katella Avenue, for street lighting purposes.
2. That the owner(s) of subject property shall pay to the
City of Anaheim the sum of 15 per front foot along
Katella Avenue, for tree planting purposes.
3. (a) That sidewalks shall be installed along Katella Avenue,
as required by the City Engineer and in accordance with
standard plans and specifications on file in the office
of the City Engineer; and (b) that a bond in an amount
and form satisfactory to the City of Anaheim shall be
posted with the City to guarantee the installation of
said sidewalks.
4. That subject property shall be developed in accordance
with the site development standards of the. C -R, Commercial
Recreation Zone.
5. That trash storage areas shall be provided in accordance
with approved plans on file in the office of the
Director of Public Works and the Superintendent of Streets.
6. That fire hydrants shall be installed as required and
determined to be necessary by the Chief of the Fire
Department.
7. That all air- conditioning facilities shall be properly
shielded from view.
8. That Conditions Nos. 1, 2 and 3(b) above mentioned, shall
be complied with prior to the issuance of a building permit.
9. That Conditions Nos. 5, 6 and 7, above- mentioned, shall be
complied with prior to final building and zoning inspections.
PHASE IV (Located generally at the northeast corner of
Anaheim Boulevard and Orangewood Avenue)
1. (a) That all engineering requirements of the City of
Anaheim along Orangewood Avenue, including preparation
of improvement plans and installation of all improvements,
such as curbs and gutters, sidewalks, street grading and
paving, drainage facilities, or other appurtenant work,
shall be complied with as required by the City Engineer
and in accordance with standard plans and specifications
on file in the office of the City Engineer; (b). that
Condition No. 1(a), Phase IV hereof, shall be temporarily
waived pending establishment of the alignment and grade
of the. Orangewood Avenue overcrossing by the State Division
of Highways, or until demanded by the City Engineer; and
(c) that the owners) of subject property shall enter
into an agreement with the City of Anaheim whereby the
owner(s) agree(s) to install the improvements required in
Condition No. 1(a) Phase IV hereof.
2. That the owners) of subject property shall deed
to the City of Anaheim adequate right -of -way for
the Orangewood Avenue overcrossing, and said right
of -way shall be deeded to the City upon demand of
the City Engineer.
3. That the owners) of subject property shall pay to
the City of Anaheim the sum of $2.00 per front foot
along Orangewood Avenue, for street lighting purposes.
4. That the owner(s) subject property shall pay to
the City of Anaheim the sum of 15 per front foot
along Orangewood Avenue, for tree planting purposes.
5. That trash storage areas shall be provided in
accordance with approved plans on file in the
office of the Director of Public Works and Superin-
tendent of Streets.
6. That fire hydrants shall be installed as required
and determined to be necessary by the Chief of the
Fire Department.
7. That all air conditioning facilities shall be properly
shielded from view.
8. That subject property shall be developed in accordance
with the site development standards of the C -R,
Commercial- Recreation Zone.
9. That Conditions Nos. 1(c), 3 and 4, above mentioned,
shall be complied with prior to the issuance of a
building permit.
10. That Conditions Nos. 5, 6 and 7, above mentioned,
shall be complied with prior to final building
and zoning inspection.
THE FOREGOING RESOLUTION is approved and signed by me
this is.th day of February 1969.
CI RK F THE CI Y OF ANAHEIM
STATE OF CALIFORNIA
COUNTY OF ORANGE SS.
CITY OF ANAHEIM
I, D3 E M. WILLIAMS, City Clerk of the City of Anaheim, do
hereby certify that the foregoing Resolution No. 69R -90 was introduced
and adopted at a regular meeting provided by law, of the City Council
of the City of Anaheim, held on the 18th day of February, 1969, by the
following vote of the members thereof:
AND I FURTHER CERTIFY that the Mayor of the City of Anaheim
approved and signed said Resolution No. 69R -90 on the 18th day of
February, 1969.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed
the official seal of the City of Anaheim this 18th day of February, 1969.
(SEAL)
AYES: COUNCILMEN: Dutton, Krein, Schutte, Clark and Pebley
NOES: COUNCILMEN: None
ABSENT: COUNCILMEN: None
:4(.
City Clerk
CIT CLERK OF THE CITY OF ANAHEIM
I, DENE M. WILLIAMS, City Clerk of the City of Anaheim, do
hereby certify that the foregoing is the original of Resolution No.
69R -90 duly passed and adopted by the Anaheim City Council on February
18, 1969.