1707 S BROOKHURST ST (3)^//Permit Types CITY OF ANAHEIMPLMBLDELEMEC
X X BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
PetTnit Number;BLD2021-01731
Issued:02/18/2022
www.anaheim.net/building
{714)765-4626
Quarter Section;36
Site Address:1707 S BROOKHURST ST.ANAHEIM.CA 92804
Legal Description:TR 2773 LOT 67 POR OF LOT
APN:12760328
Project Description:Tenant Improvement:Install new kitchen hood.
0 Valuation:10,000.00LIvirtgArea;
Garage Area:
Carport Area:
Balcony /Deck Area:
Cool Roof:
Number of Stories;
VBConstructionTypes;
Occupancy Groups;
Fire Sprinklered:
Total Fees paid for Permit:
No
912.80
People Associated with Project:
Permit Applicant
Owner
Engineer -Mechanical
Engineer -Civil
1707 S BROOKHURST ST ANAHEIM.CA 92804
9351 DARROW DR HUNTINGTON BEACH.CA 92646
2416 W VALLEY BLVD201710171207578860 ANAHEIM,CA 91803
13902 HARBOR BLVD #2A GARDEN GROVE,CA 92843
MOHD HURANI
SUSAN NA TR
RAYMOND ZHONG
BAO D PHAM
Qty TypeTypeElectricalFixtures Plumbing Fixtures Qty Mechanical Fixtures Qty
Commercial Hoods (including ducts)
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONSEiMCityofAnaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made,Engineering Final (714)765-5126
Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION
Do not pour concrete until the following applicable items have been signed;Fire Dept.Final (714)765-5041
Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste)
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subtloor or pour floor slab until the foilwing applicable items have been
Signed:^ Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)
Building Inspections j|Sj3P£QXIONElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)NOT COMPLETEDFloor(Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
WE:Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sic:-'ed ^^
1st Floor Shear
Mechanical InspectionsFiresprlnkler(Rough)(Fire Dept.)
^c2ndFloorShear ✓“£-
IRoof(Sheathing/Diaphragm/Frame)Ll±i-fr
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg..Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
iDo not backtili uc^lc-ss gianed oil
Sewer
Water Engineering Backflow (Testable Only)
Water Service