Loading...
1717 S BROOKHURST ST (4)Permit Types CITY OF ANAHEIMPLMELEMECBLD X XXX BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2021-00697 Issued:01/20/2022 www.anaheim.net/building (714)765-4626 Quarter Section:36 Site Address:1717 S BROOKHURST ST.ANAHEIM.CA 92804 Legal Description:TR 2773 LOT 67 POR OF LOT APN:12760329 Project Description:Tenant Improvement:400 sf interior remodel to remove non-bearing walls to expand restroom into existing corridor. 30,000,000Valuation: Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: Number of Stories:Living Area: Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: VB B,B Yes 1,986-40 People Associated with Project: 18075 VENTURA BLVD STE #101 ENCINO,CAContractor Permit Applicant Owner Engineer -Electrical Architect LOS ANGELES RETROFIT &AMP:CONSTRUC Cindy Santamaria NORTH AMERICAN ISLAMIC ANTHONY FERNANDEZ HAITHAM A ABDELHAFEEZ 745 MCCLINTOCK DR #114 BURR RIDGE.IL 60527 13536 LAKEWOOD BLVD STE 334 202102190904463760 BELLFLOWER,CA 90706 1451 S HACIENDA ST200208051908676495 ANAHEIM,CA 92804 QtyMechanicalFixturesQtyQtyTypePlumbingFixturesElectricalFixturesType 61VentilationFan-<=300 cfm on single duct25Receptacle,switches,lights Floor Drain 7Lavatory Repair/Drainage Alteration/Vent Piping Sewer per 100 ft. Water Closet Water Main per 100 ft. 1 1 4 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. FINAL INSPECTIONS DATE INSPECTORCityofAnaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Ailow 10 business days)Electricai Ground Eiectrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the foilwing applicable items have been iiigp^d;,, Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas inspectionnotCOMPLErLD Mechanical (Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) miF:Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathlng/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele,,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Eie,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor (Do not backfill unless siuned olfl Sewer Water Engineering Backflow (Testable Only) Water Service