2169 W CHALET AVE (3)Permit Types CITY OF ANAHEIMPLMBLDMECELE
X X BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2022-00171
Issued:03/25/2022
www.anaheim.net/building
(714)765-4626
Quarter Section:42
Site Address:2169 W CHALET AVE,ANAHEIM.CA 92804
Legal Description;N TR 6544 BLK LOT 29
APN:12863139
Project Description:Photovoltaic System:Installation residential roof mounted system with (12)modules,(1)inverter,(1)batter backup
and new 125 amp sub panel
LMng Area:
Garage Area:
Carport Area:
Balcony /Deck Area:
Cool Roof:
Number of Stories:1 12.000.00Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
N/A
No
1,067,56
People Associated with Project:
Owner
Contractor
Engineer -Civil
2169 W CHALET AVE
225 BUSH STREET STE 1400200807221505542300 SAN FRANCISCO,CA 92614
23833 Copper Court Wildomar,CA 92595
PEREZ JORGE N &IVETTE A
SUNRUN INSTALLATION SERVICES INC
Eugene Munyanziza
Qty TypeTypeElectricalFixtures Plumbing Fixtures Qty Mechanical Fixtures Qty
1Generators/Transformers -up to 1 hp.Up
to 1 kva
Inverter
Sub Panel/Temp Pwr -Under 600 V,up to
200 amps
1
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONSCityofAnaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION
Do not pour concrete until the following applicable items have been signed;Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
s-igned' Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:^
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele..Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
[i-it [>.-K-kfili Linlf-cs signed otti
Sewer
Water Engineering Backflow (Testable Only)
Water Service