2509 W CRESCENT AVEPermit Types /
CITY OF ANAHEIMPLMBLDELEMEC
X
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2022-01031
Issued:03/10/2022
www.anaheim.net/building
(714)765-4626
Quarter Section:25
Site Address:2509 W CRESCENT AVE,ANAHEIM,CA 92801
Legal Description:S TWP 4 RGE 10 SEC 7 SEC 7 T4 R 10 POR SW1/4NW1/
APN:07129516
Project Description:Reroof;Tear off existing material and resheath as needed to install (17,000)sq
only
ft of composition shingle over house
1LivingArea;
Garage Area:
Carport Area:
Balcony I Deck Area:
Cool Roof;
Number of Stories;Valuation:
Construction Types;
Occupancy Groups;
Fire Sprinklered:
Total Fees paid for Permit:
20,000.00
N/A
No
649.60
People Associated with Project:
Contractor
Permit Applicant
Owner
2122 W MISSION RD ESCONDIDO.CA 92029619ROOFINGLLC
Pedro Ramirez
DELAISLA JEREMIAH &BERENICE 2509 W CRESCENT AVE
Qty Type QtyTypeElectricalFixturesPlumbingFixtures Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit Is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste)
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Eiectrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
Signed:^^ Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagatlon Measures
Framing (Only after PIbg.,Ele,,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
Do no;LHcktil'u’'loss o!l!
Sewer
Water Engineering Backflow (Testable Only)
Water Service