1537 S DALLAS DRPermit Types CITY OF ANAHEIMPLMBLDELEMEC
X
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2022-00331
Issued:01/25/2022
www.anaheim.net/building
(714)765-4626
Quarter Section:43
Site Address:1537 S DALLAS DR,ANAHEIM.CA 92804
Legal Description:N TR 3247 BLK LOT 29
APN:12845202
4
I
Project Description:Residential Remodel:Replace (4)retrofit windows
Living Area:
Garage Area:
Carport Area;
Balcony /Deck Area:
Cool Roof:
Number of Stories:0 Valuation:600.00
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
N/A
No
167.00
People Associated with Project:
Permit Applicant
Owner
Luis Banda
LUNSFORD JENNIFER A 1537 S DALLAS DR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
INSPECTORFINALINSPECTIONSDATE
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste)
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the foilwing applicable items have been
signed: Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)ERMIT EXPlKtD
inspection
NOT COMPI FTFp
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:,, DATE-
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing inspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or piaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
(Do nol backlill unless signed ott)
Sewer
Water Engineering Backflow (Testable Only)
Water Service