203 S GILBERT STPermit Types CITY OF ANAHEIMPLMELEMECBLD
X
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2022-02932
Issued:06/29/2022
www.anaheim.net/building
(714)765-4626
Quarter Section;33
Site Address:203 S GILBERT ST,ANAHEIM,CA 92804
Legal Description:N TR 1940 BLK LOT 72
APN:12704421
Project Description:Re-roof;tear of existing material,re-sheath as necessary,and install (30)squares of composition shingles.
1 17,000,00LivingArea:
Garage Area:
Carport Area:
Balcony /Deck Area:
Cool Roof:
Number of Stories:Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
N/A
341.21
People Associated with Project:
7171 SYRACUSE AVE STANTON,CA 90680Contractor
Permit Applicant
Owner
NHAT TRAN
Viet HPham
NGUYEN STEVE &TIFFANY 203 S GILBERT ST
Qty Type Plumbing Fixtures Qty Mechanical Fixtures QtyTypeElectricalFixtures
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit Is required to commence or continue work.
FINAL INSPECTIONS DATE INSPECTOR
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the follovwng applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/FormsH'renches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
siuiied Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed 7 .F-22 l^x <â– Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed;
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Constmclion
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
iPn not sinnnd ('Hi
Sewer
Water Engineering Backflow (Testable Only)
Water Service