Resolution-PC 2023-024RESOLUTION NO. PC2023-024
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF ANAHEIM APPROVING A CONDITIONAL USE
PERMIT TO CONSTRUCT A NEW 2,350 SQUARE FOOT DRIVE -
THROUGH RESTAURANT AND A NEW 3,600 SQUARE FOOT
CAR WASH FACILITY AND MAKING CERTAIN FINDINGS IN
CONNECTION THEREWITH
(DEV2022-00049)
(88 - 96 EAST ORANGETHORPE AVENUE AND 1632 NORTH LEMON STREET)
WHEREAS, the Planning Commission of the City of Anaheim (the "Planning
Commission") did receive a verified petition for a conditional use permit to construct a new 2,350
square foot drive -through restaurant and, a new 3,600 square foot car wash facility (the "Proposed
Project") in conjunction with a request for a variance to permit two new freestanding signs within
the ultimate right-of-way for that certain real property located at 88-96 East Orangethorpe Avenue
and 1600-1632 North Lemon Street in the City of Anaheim, County of Orange, State of California,
as generally depicted on the map attached hereto as Exhibit A and incorporated herein by this
reference (the "Property"); and
WHEREAS, the Property is approximately 10 acres in size and consists of two
properties developed as a large commercial retail center occupied by a Walmart Super Center, an
automotive repair business, a vacant retail store, and a Sonic Drive -In restaurant. The project site
is designated for Regional Commercial land uses in the General Plan. The property is located in
the "C-G" General Commercial Zone and is subject to the zoning and development standards
contained in Chapter 18.08 (Commercial Zones) of the Zoning Code ("the Code"); and
WHEREAS, Automotive -Washing and Drive -Through Facilities require a
conditional use permit subject to the approval of the Planning Commission pursuant to Subsection
.040 of Section 18.08.030 (Uses); and
WHEREAS, the Planning Commission did hold a public hearing at the Civic Center
in the City of Anaheim on October 23, 2023, at 5:00 p.m., with notice of said public hearing having
been duly given as required by law and in accordance with the provisions of Chapter 18.60
(Procedures) of the Code, to hear and consider evidence for and against the Proposed Project, and
to investigate and make findings and recommendations in connection therewith; and
WHEREAS, pursuant to and in accordance with the provisions of the California
Environmental Quality Act (Public Resources Code Section 21000 et seq.; herein referred to as
"CEQA"), the State of California Guidelines for Implementation of the California Environmental
Quality Act (Title 14 of the California Code of Regulations,; herein referred to as the "CEQA
Guidelines"), and the City's CEQA procedures, the City is the "lead agency" for the preparation
and consideration of environmental documents for the Proposed Project; and
WHEREAS, the Planning Commission finds and determines that this project is
Categorically Exempt from the requirements to prepare additional environmental documentation
pursuant the CEQA Guidelines, Section 15303, Class 3 (New Construction or Conversion of Small
Structures). The Class 3 Exemption consists of construction and location of limited numbers of
new, small facilities or structures, including restaurants and car wash facilities in urbanized areas,
applying to up to four buildings not exceeding 10,000 square feet, and at the time of this
determination would not cause a significant effect on the environment. The project proposes to
construct two buildings not exceeding 5,950 square feet in an existing shopping center. Pursuant
to Section 15300.2(c) and 15303 of Title 14 of the California Code of Regulations, there are no
unusual circumstances in respect to the Proposed Project for which staff would anticipate a
significant effect on the environment and, therefore, the proposed project would be categorically
exempt from the provisions of CEQA; and
WHEREAS, the Planning Commission, after due inspection, investigation and study made
by itself and in its behalf, and after due consideration of all evidence and reports offered at said
hearing with respect to the request for a conditional use permit, does find and determine the
following facts:
1. The Proposed Project is an allowable use within the "C-G" General Commercial
Zone Section 18.08.030 (Uses) of the Code, subject to a conditional use permit for Automotive —
Washing and Drive -Through Facilities.
2. The Proposed Project, as conditioned herein, would not adversely affect the growth
and development of the surrounding land uses in that the Proposed Project would be compatible
and consistent with other restaurant uses and car wash facilities in the surrounding area. The site
is located along a developed commercial corridor and is nearby commercial retail shopping centers
in the City of Fullerton that are developed with similar uses as those proposed.
3. The size and shape of the Property is adequate to allow the full development of the
proposed use, in a manner not detrimental to either the particular area or health and safety and
would allow for the full development of the Proposed Project without conflicting with existing
uses.
4. The traffic generated by the proposed use will not impose an undue burden upon
the streets and highways designed and improved to carry the traffic in the area. The City's Traffic
and Transportation Division has reviewed the queuing analyses for both uses and the Parking
Demand Memo for the car wash facility and has determined that neither the proposed drive -
through restaurant nor the car wash facility would have a significant impact on traffic, that there
would be adequate on -site circulation, and that adequate queuing would be provided for each use
through the design of the drive -through lanes.
5. The granting of the conditional use permit under the conditions imposed, if any,
will not be detrimental to the health and safety of the citizens of the City of Anaheim because the
Proposed Project would not substantially change the nature of the uses on the property, would not
increase the need for additional parking spaces, and would be compatible with the uses in the
surrounding area, subject to the conditions contained herein.
WHEREAS, the Planning Commission determines that the evidence in the record
constitutes substantial evidence to support the actions taken and the findings made in this
Resolution, that the facts stated in this Resolution are supported by substantial evidence in the
record, including testimony received at the public hearing, the staff presentations, the staff report,
and all materials in the project files. There is no substantial evidence, nor are there other facts,
that negate the findings made in this Resolution. The Planning Commission expressly declares
- 2 - PC2023-024
that it considered all evidence presented and reached these findings after due consideration of all
evidence presented to it.
NOW, THEREFORE, BE IT RESOLVED, that pursuant to the above findings, this
Planning Commission does hereby approve the conditional use permit contingent upon and subject
to the conditions of approval set forth in Exhibit B attached hereto and incorporated herein by this
reference, which are hereby found to be a necessary prerequisite to the proposed use of the Property
for which the conditional use permit is applicable in order to preserve the health, safety and general
welfare of the citizens of the City of Anaheim. Extensions for further time to complete the
conditions of approval may be granted in accordance with Section 18.60.170 of the Code. Timing
for compliance with conditions of approval may be amended by the Planning Director upon a
showing of good cause provided (i) equivalent timing is established that satisfies the original intent
and purpose of the condition, (ii) the modification complies with the Code, and (iii) the applicant
has demonstrated significant progress toward establishment of the use or approved development.
BE IT FURTHER RESOLVED that any amendment, modification, or revocation
of this permit may be processed in accordance with Chapters 18.60.190 (Amendment of Permit
Approval) and 18.60.200 (Revocation or Modification of Permits) of the Code.
BE IT FURTHER RESOLVED that the Planning Commission does hereby find
and determine that adoption of this Resolution is expressly predicated upon applicant's compliance
with each and all of the conditions hereinabove set forth. Should any such condition, or any part
thereof, be declared invalid or unenforceable by the final judgment of any court of competent
jurisdiction, then this Resolution, and any approvals herein contained, shall be deemed null and
void.
BE IT FURTHER RESOLVED that approval of this application constitutes approval
of the proposed request only to the extent that it complies with the Code and any other applicable
City, State, and Federal regulations. Approval does not include any action or findings as to
compliance or approval of the request regarding any other applicable ordinance, regulation, or
requirement.
THE FOREGOING RESOLUTION was approved at the Planning Commission
meeting of October 23, 2023. Said resolution is subject to the appeal provisions set forth in
Chapter 18.60 (Procedures) of the Anaheim Municipal Code pertaining to appeal procedures and
may be replaced by a City Council Resolution in the event of an appeal.
CHAIRPERSON, PLANNING COM SSION
OF THE CITY OF ANAHEIM
ATTEST:
SECRETARY, PLANNING COMMISSION
OF THE CITY OF ANAHEIM
- 3 - PC2023-024
EXHIBIT "A"
DEV NO.2022-00049
APN:
j
073-090-30
073-090-
i
ii
i
E ORANGETHORPE AVE
i
I
a
3
J
N_
Z
v'f
z
0
W
J
z
E D.URST ST
1
1
ORANGEFAiR AVE
1
1
1
s° 10O
Source: Recorded Tract Maps and/or City GIS.
Fee
Please note the accuracy is +/- two to five feet.
PC2023-024
EXHIBIT "B"
CONDITIONAL USE PERMIT
(DEV2022-00049)
RESPONSIBLE
NO.
CONDITIONS OF APPROVAL
DEPARTMENT
PRIOR TO ISSUANCE OF GRADING PERMITS
1
Prepare and submit a final grading plan showing building footprints, pad
Public Works
elevations, finished grades, drainage routes, retaining walls, erosion control,
Development Services
slope easements and other pertinent information in accordance with
Anaheim Municipal Code and the California Building Code, latest edition.
2
Prepare and submit a final drainage study, including supporting hydraulic
Public Works
and hydrological calculations to the City of Anaheim for review and
Development Services
approval. The study shall confirm or recommend changes to the City's
adopted Master Drainage Plan by identifying off -site and on -site storm
water runoff impacts resulting from build -out of permitted General Plan
land uses. In addition, the study shall identify the project's contribution and
shall provide locations and sizes of catchments and system connection
points and all downstream drainage -mitigating measures including but not
limited to offsite storm drains and interim detention facilities.
3
Execute a Save Harmless Agreement with the City of Anaheim for any
Public Works
storm drain connections to the City's storm drain system. The agreement
Development Services
shall be recorded by the applicant on the property prior to the issuance of
any permits.
4
Obtain the required coverage under California's General Permit for
Public Works
Stormwater Discharges associated with Construction Activity by providing
Development Services
a copy of the Notice of Intent (NOI) submitted to the State Water Resources
Control Board and a copy of the subsequent notification of the issuance of
a Waste Discharge Identification (WDID) number.
5
Submit a Water Quality Management Plan (WQMP) to the City for review
Public Works
and approval. The WQMP shall be consistent with the requirements of
Development Services
Section 7 and Exhibit 7.II of the Orange County Drainage Area Management
Plan (DAMP) for New Development/Significant Redevelopment projects.
The WQMP shall identify potential sources of pollutants during the long-
term on -going maintenance and use of the proposed project that could affect
the quality of the stormwater runoff from the project site; define Source
Control, Site Design, and Treatment Control (if applicable) best
management practices (BMPs) to control or eliminate the discharge of
pollutants into the surface water runoff; and provide a monitoring program
to address the long-term implementation of and compliance with the defined
BMPs.
6
Submit a geotechnical report to the Public Works Department for review
Public Works
and approval. The report shall address grading and any proposed infiltration
Development Services
features of the WQMP.
PC2023-024
RESPONSIBLE
NO.
CONDITIONS OF APPROVAL
DEPARTMENT
7
The Owner/Developer shall install an approved backflow prevention
Public Utilities Water
assembly on the water service connection(s) serving the property, behind
Engineering
property line and building setback in accordance with Public Utilities
Department Water Engineering Division requirements.
PRIOR TO ISSUANCE OF BUILDING PERMITS
8
Obtain a Right -of -Way Construction Permit (RCP) from the Public Works
Public Works
Department and post a security for construction of all required public
Development Services
improvements within street right-of-way.
9
Submit an interim soils report indicating pad compaction and site stability
Public Works
prepared by the projects Geotechnical Engineer of Record. The pad
Development Services
compaction report shall include a site plan showing the compaction testing
locations.
10
Provide a certificate from the project's Registered Civil Engineer certifying
Public Works
that the finished grading has been completed in accordance with the City
Development Services
approved grading plan.
11
The legal owner shall submit an application for a Subdivision Map Act
Public Works
Certificate of Compliance to the Public Works Department. The Certificate of
Development Services
Compliance shall be approved by the City Surveyor and recorded at the
Orange County Recorder's office.
12
All onsite sewer lines shall be privately owned and maintained by the property
Public Works
owner and shall be designed per current California Building/Plumbing Code,
Development Services
and shall be submitted to, reviewed, and approved by the Building Division.
13
All site landscape plans shall comply with the City of Anaheim adopted
Public Works
Landscape Water Efficiency Guidelines. This ordinance is in compliance with
Development Services
the State of California Model Water Efficient Landscape Ordinance (AV
1881).
14
The developer shall pay all applicable development impact fees required under
Public Works
the Anaheim Municipal Code.
Development Services
15
The developer shall pay the applicable storm drain assessment fee for the
Public Works
Lemon Street Storm Drain Assessment Area.
Development Services
16
The Owner/Developer shall post a bond shall for all traffic related
Public Works
improvements including, but not limited to striping, signage, and traffic
Development Services
signal modifications as required for said project. All improvements
identified as required for the project opening shall be completed prior to
final building and zoning inspection.
17
Curbs adjacent to the drive aisles shall be painted red to prohibit parallel
Public Works
parking in the drive aisles. Red curb locations shall be clearly labeled on
Traffic Engineering
building plans.
PC2023-024
RESPONSIBLE
NO.
CONDITIONS OF APPROVAL
A private water system with separate water service for fire protection and
DEPARTMENT
Public Utilities
18
domestic water shall be provided and shown on plans submitted to the Water
Water Engineering
Division of the City of Anaheim Public Utilities Department.
19
All backflow equipment shall be located above ground outside of the street
Public Utilities
setback area in a manner fully screened from all public streets and alleys.
Water Engineering
Any backflow assemblies currently installed in a vault will have to be
brought up to current standards. Any other large water system equipment
shall be installed to the satisfaction of the Water Engineering Division
outside of the street setback area in a manner fully screened from all public
streets and alleys. Said information shall be specifically shown on plans and
approved by Water Engineering and Cross Connection Control Inspector.
20
All requests for new water services, backflow equipment, or fire lines, as
Public Utilities
well as any modifications, relocations, or abandonments of existing water
Water Engineering
services. backflow equipment, and fire lines, shall be coordinated and
permitted through Water Engineering Division of the Anaheim Public
Utilities Department.
The Owner shall irrevocably offer to dedicate to the City of Anaheim (i) an
Public Utilities
21
easement for all large domestic above -ground water meters and fire
Water Engineering
hydrants, including a five (S)-foot wide easement around the fire hydrant
and/or water meter pad. (ii) a twenty (20) foot wide easement for all water
service mains and service laterals all to the satisfaction of the Water
Engineering Division. The easements shall be granted on the Water
Engineering Division of the Public Utilities Department's standard water
easement deed. The easement deeds shall include language that requires
the Owner to be responsible for restoring any special surface
improvements, other than asphalt paving, including but not limited to
colored concrete, bricks, pavers, stamped concrete, decorative hardscape,
walls, or landscaping that becomes damaged during any excavation, repair,
or replacement of City owned water facilities. Provisions for the repair,
replacement, and maintenance of all surface improvements other than
asphalt paving shall be the responsibility of the Owner and included and
recorded in the Master CC&Rs for the project.
The Car Wash shall comply with all state laws and local ordinances for
Public Utilities
22
Water Conservation Measures, including Chapter 10.18 of Anaheim
Water Engineering
Municipal Code and Ordinance relating to Water Reduction provisions.
Water improvement plans shall be submitted to the Water Engineering
Public Utilities
23
Division for approval and a performance bond in the amount approved by
Water Engineering
the City Engineer and form approved by City Attorney shall be posted with
the City of Anaheim.
Individual water service and/or fire line connections will be required for
Public Utilities
24
each parcel or residential, commercial, industrial unit per Rule 18 of the City
Water Engineering
of Anaheim's Water Rates, Rules, and Regulations.
PC2023-024
RESPONSIBLE
NO.
CONDITIONS OF APPROVAL
DEPARTMENT
25
Prior to approval of permits for improvement plans, the property
Public Utilities
owner/developer shall coordinate with Electrical Engineering to establish
Electrical Engineering
electrical service requirements and submit electric system plans, electrical
panel drawings, site plans, elevation plans, and related technical drawings
and specifications.
26
Prior to the connection of electrical service, the legal owner shall provide to
Public Utilities
the City of Anaheim a Public Utilities Easement with dimensions as shown
Electrical Engineering
on the approved utility service plan.
27
Prior to the connection of electrical service, the legal owner shall submit
Public Utilities
payment to the City of Anaheim for service connection fees.
Electrical Engineering
28
All CBC and CFC requirements shall be followed for permit issuance. Any
Anaheim Fire
fire permits shall be submitted directly to the Anaheim Fire Prevention
Department
Bureau.
Community Risk
Reduction Division
An adequate water supply capable of providing minimum fire flow
Anaheim Fire
29
requirements for fire hydrants and/or fire sprinkler systems shall be met.
Department
Community Risk
Reduction Division
PRIOR TO FINAL BUILDING AND ZONING INSPECTION
All public improvements shall be constructed by the developer, inspected,
Public Works
30
and accepted by Construction Services prior to final building and zoning
Development Services
inspection.
All remaining fees/deposits required by the Public Works Department Public Works
31
must be paid in full. Development Services
Prior to final building and zoning inspections, all required WQMP items shall Public Works
32
be inspected and operational. Development Services
Record Drawings and As -Built Plans shall be submitted for review and Public Works
33
approval to the Public Works Department, Development Services Development Services
Division.
All fire lanes shall be posted with "NO PARKING ANY TIME." Said Public Works
34
information shall be specifically shown on the plans submitted for Building Traffic Engineering
plan check.
The Owner/Developer shall install an approved backflow prevention Public Utilities Water
35
assembly on the water service connection(s) serving the property, behind Engineering
property line and building setback in accordance with Public Utilities
Department Water Engineering Division requirements.
OPERATIONAL
CONDITIONS
PC2023-024
RESPONSIBLE
NO.
CONDITIONS OF APPROVAL
DEPARTMENT
36
Ongoing during project operations, vehicle deliveries including loading and
Public Works
unloading shall be performed on site. Delivery vehicles shall not block any
Traffic Engineering
part of the public right of way.
37
Ongoing during project operation, should the vehicle queue reach
Public Works
Orangethorpe Avenue, staff members shall be positioned at the end of the
Traffic Engineering
on -site queue near the entrances to direct traffic. This measure shall be
implemented for a short timeframe, as needed, until the queue dissipates.
The Owner/Developer shall be responsible for restoring any special surface
Public Utilities Water
38
improvements, other than asphalt paving, within any right-of-way, public
Engineering
utility easement or City easement area including but not limited to colored
concrete, bricks, pavers, stamped concrete, walls, decorative hardscape, or
landscaping that becomes damaged during any excavation, repair, or
replacement of City owned water facilities. Provisions for maintenance of
all said special surface improvements shall be included in the recorded
Master CC&Rs for the project and the City easement deeds.
GENERAL
CONDITIONS
The following minimum horizontal clearances shall be maintained between
Public Utilities Water
39
proposed water main and other facilities:
Engineering
• 10-feet minimum separation (outside wall -to -outside wall) from
sanitary sewer mains and laterals
• 5-feet minimum separation from all other utilities, including storm
drains, gas, and electric
6-feet minimum separation from curb face
• 10-feet minimum separation from structures, footings, and trees.
The following minimum clearances shall be provided around all new and
existing public water facilities (e.g., water mains, fire hydrants, service
laterals, meters, meter boxes, backflow devices, etc.):
• 10 feet from structures, footings, walls, stormwater BMPs, power
poles, streetlights, and trees.
• 5 feet from driveways, BCR/ECR of curb returns, and all other
utilities (e.g., storm drain, gas, electric, etc.) or above ground
facilities.
No public water main or public water facilities shall be installed in private=Publicities
Water
40
alleys or paseo areas.
eering
No public water mains or laterals allowed under parking stalls or parking
Public Utilities Water
41
lots.
Engineering
PC2023-024
RESPONSIBLE
NO.
CONDITIONS OF APPROVAL
DEPARTMENT
42
All new landscaping shall be installed by the owner developer in
planning and Building
conformance with Chapter 18.46 "Landscape and Screening" of the
Department,
Anaheim Municipal Code and shall be maintained in perpetuity.
Landscaping shall be replaced in a timely manner if it is removed, damaged,
planning Services
diseased and/or dead.
Division
H3g
All new signage shall be installed in conformance with Chapter 18.44
planning and Building
43
"Signs" of the Anaheim Municipal Code. Separate permits for signage shall
Department,
be obtained from the Planning and Building Department.
Planning Services
Division
The facility shall be constructed and operated in accordance with the
planning and Building
44
Conditional Use Permit Request and Justification Letter submitted as part
Department,
of the application. Any changes to the facility's operation shall be submitted
subject to review and approval by
planning Services
by the owner/developer/tenant/operator
the Planning and Building Director to determine substantial conformance
Division
and to ensure compatibility with the surrounding uses.
The property shall be developed substantially in accordance with plans and
planning and Building
45
specifications submitted to the City of Anaheim by the applicant and which
Department,
plans are on file with the Planning Department and as conditioned herein.
Planning Services
Division
46
The Owner/Developer is responsible for paying all charges related to Teanning
within 30 days of
and Building
Department,
processing of this discretionary case application
to the issuance of building permits
issuance of the final invoice or prior
this whichever occurs first. Failure to pay all charges shall result in
Planning Services
Division
project,
delays in the issuance of required permits or may result in the revocation of
the approval of this application.
The Owner/Developer shall defend, indemnify, hold harmless the C
fy Ito
lanning and Building
47
and its officials, officers, employees and agents (collectively referred
"Indemnitees") from any and all claiPlanning
Department,
individually and collectively as
brought against Indemnitees to attack, review, set
Services
actions or proceedings
aside, void, or annul the decision of the Indemnitees concerning this permit
Division
or any of the proceedings, acts or determinations taken, done, or made prior
legality or validity of
to the decision, or to determine the reasonableness,
attached thereto. The Applicant's indemnification is intended
any condition
to include, but not be limited to, damages, fees and/or costs awarded against
or incurred by Indemnitees and costs of suit, claim or litigation, including
without limitation attorneys' fees and other costs, liabilities and expenses
incurred by Indemnitees in connection with such proceeding.
PC2023-024
STATE OF CALIFORNIA)
COUNTY OF ORANGE ) ss.
CITY OF ANAHEIM )
I, Heather Flores, Secretary of the Planning Commission of the City of Anaheim, do
hereby certify that the foregoing resolution was passed and adopted at a meeting of the Planning
Commission of the City of Anaheim held on October 23, 2023, by the following vote of the
members thereof:
AYES: Chairperson Kring, Vice Chairperson Henninger, and Commissioners Castro,
Lieberman, Perez, and Tran-Martin.
0t91-9.Y
ABSENT: Commissioner Walker
IN WITNESS WHEREOF, I have hereunto set my hand this 23`d day of October 2023.
SECRETARY, PLANNING COMMISSION
OF THE CITY OF ANAHEIM
PC2023-024