1968-752RESOLUTION NO. 68R- 759
A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF ANAHEIM APPROVING AND AUTHORIZING THE
EXECUTION OF AN AGREEMENT BETWEEN THE CITY
AND THE ATCHISON, TOPEKA AND SANTA FE RAILWAY
COMPANY PROVIDING FOR THE EXTENSION OF TUSTIN
AVENUE ACROSS SAID RAILWAY COMPANY'S TRACK.
WHEREAS, the City of Anaheim proposes to construct
Tustin Avenue at grade across the right of way and track of
The Atchison, Topeka and Santa Fe Railway Company, having a
roadway width of 102 feet between curbs,. the centerline thereof
crossing said track at Mile Post 0.8, Olive District Branch
Line; and
WHEREAS, said Railway Company is willing that the City
extend said street across its right of way and track at grade
as a public street crossing, as authorized by Decision No. 72891
of the Public Utilities Commission, State of California; and
WHEREAS, the parties desire to enter into an agreement
setting forth the work to be done by each party in the extension
of Tustin Avenue across the right of way and track of said
Railway Company as a public street crossing, the proportionate
share of the costs to be borne by each, and providing for the
maintenance of said street and crossing; and
WHEREAS, The Atchison, Topeka and Santa Fe Railway
Company has tendered to the City an agreement to be entered into
between the parties providing for said street construction, the
terms and conditions of which the City Council finds are satis-
factory and should be approved.
NOW, THEREFORE, BE IT RESOLVED by the City Council of
the City of Anaheim that the agreement this day tendered to the
City by The Atchison, Topeka and Santa Fe Railway, to be made
and entered into between the parties, providing for the construc-
tion of Tustin Avenue across the right of way and track of The
Atchison, Topeka and Santa Fe Railway, upon the following terms
and conditions:
"1. Santa Fe will, at expense of City (a) prepare its track
to receive paving, including placing header planks for
roadway width of 102 feet, (b) raise or relocate its
communication and signal lines and poles to proper
side and overhead clearance of the proposed street and
(c) install four (4) Standard No. 8 flashing light
signals supplemented by four (4) automatic crossing
gates, two (2) of which are to be located on median
islands having minimum width of eight feet.
2. City will, at its expense, (a) do all work except that
specified to be done by Santa Fe in above Paragraph 1,
necessary to said street construction, including
adequate drainage facilities, and placing paving within
track area, (b) relocate or protect by encasement or
otherwise property or facilities of licensees of Santa
Fe if said licensees require same.
3. Santa Fe will do the work specified in above Paragraph
1, as soon as practicable, considering completion of
said street construction, availability of materials
and manpower, and in consideration thereof City will
pay to Santa Fe the actual cost thereof, presently
estimated by Santa Fe to be Thirty Two Thousand Four
Hundred Eighty Seven ($32,487.00) Dollars.
4. That upon completion of work to be done by Santa Fe,
specified in Paragraph 1 hereof, Santa Fe will render
City a bill for the actual costs thereof and City
will promptly reimburse Santa Fe for such costs.
be, and the same is hereby approved.
BE IT FURTHER RESOLVED that the Mayor and City Clerk
be and they are hereby authorized to execute said agreement for
and on behalf of the City of Anaheim.
THE FOREGOING RESOLUTION is approved and signed by
me this loth day of December, 1968.
ATTEST:
5. After installation of railroad crossing protection
signals and appurtenances under terms of this
agreement, Santa Fe shall physically maintain same
so long as they remain in place. The maintenance
cost of said signals and appurtenances shall be
borne by the City pursuant to the provisions of
Section 1202.2 of the California Public Utilities
Code.
6. Santa Fe will, at its sole expense, maintain the street
paving between lines two feet outside of and parallel
with the rails of the track.
7
7 City will maintain, at its sole expense, any improvement
with said street extension and public crossing other
than specified to be maintained by Santa Fe in
Paragraph 6 hereof.
8. City, or City's Contractor, will comply with. Santa Fe's
rules and regulations and the instructions of Santa
Fe's representatives in relation to proper manner of
protecting Santa Fe's track and traffic moving thereon,
as well as wires, signals and other facilities or
property of Santa Fe, or its tenants or licensees, at
or in vicinity Of the work during the period of
construction of said street extension, and shall perform
the work in a manner satisfactory to Santa Fe or its
designated representative, and at such times as shall
not endanger or interfere with safe operation of
Santa Fe's track and other facilities."
CLE •F TH CITY OF ANAHEIM
-2
STATE OF CALIFORNIA
COUNTY OF ORANGE SS.
CITY OF ANAHEIM
I, DENE M. WILLIAMS, City Clerk of the City of Anaheim, do
hereby certify that the foregoing Resolution No. 68R -752 was introduced
and adopted at a regular meeting provided by law, of City Council of
the City of Anaheim, held on the 10th day of December, 1968, by the
following vote of the members thereof:
AYES: COUNCILMEN: Dutton, Krein, Schutte and Pebley
NOES: COUNCILMEN: None
ABSENT: COUNCILMEN: Clark
AND I FURTHER CERTIFY that the Mayor of the City of Anaheim
approved and signed said Resolution No. 68R -752 on the 10th day of
December, 1968.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the
official seal of the City of Anaheim this 10th day of December, 1968.
(SEAL)
CI CLERK OF THE CITY OF ANAHEIM
I, DENE M. WILLIAMS, City Clerk of the City of Anaheim, do
hereby certify that the foregoing is the original of Resolution No. 68R -752
duly passed and adopted by the Anaheim City Council on December 10, 1968.