Loading...
1665 W. ORD WAYPermit Types CITY OF ANAHEIMPLMMECBLDELE X IBUILDINGDIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2023-05695 Issued;10/30/2023 awww.anaheim.net/building (714)765^626 Quarter Section;203 Site Address:395 S OLD BRIDGE RD,ANAHEIM,CA 92808 Legal Description:N TR 8560 BLK LOT 36 APN:35635302 Project Description:Reroof to remove and install (36)squares of composition and shingles and (2)squares of flat roof torch down over house and attached garage. 1 28,500.00Valuation:Living Area; Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: Number of Stories: N/AConstructionTypes: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit:376.71 People Associated with Project: 5127 NORWOOD AVENUE201802061610118662 RIVERSIDE,CA 92505Contractor Permit Applicant Owner UNIVERSE ROOFING INC Samuel Ruvalcaba ACHS.SHARON MTR 395 SOLD BRIDGE RD Qty QtyQtyTypePlumbingFixturesMechanicalFixturesTypeElectricalFixtures The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made,Engineering Final (714)765-5126 Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days]Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been SiOtlCfj Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned- 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.S Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor iii'il h;K~ktill ii'ilpg;';ginnpd off Sewer Water Engineering Backflow (Testable Only) Water Service