Loading...
2210 E. ORANGEWOOD AVEPermit Types BLD ELE MEC PLM XX X X Permit Number:BLD2016-05693 Issued;06/02/2017 CITY OF ANAHEIM INSPECTION REQUEST LINE: (714)765-4626 Quarter Section;119 BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765 -5153 Site Address:2210 E ORANGEWOOD AVE Legal Description:P BK 30 PG 34 PAR 14 Project Description:Change of Use:9,620 sq.ft,of SI to A2 occupancy indoor kitchen/seating.6,400 sq.ft,outdoor patio/assembly area.705 sq.ft,to install (3)awnings.15,830 sq.ft.SI to FI for production/warehouse (cold warehouse).Convert 3,913 sq.ft.SI to B occupancy.886 sq.ft.2nd story addition to create conference room and storage room.REF: BLD2017-02222;BLD2017-02223;BLD2017-02224 New /Additional Area;698 29,363 $50,000.00Valuation: Construcion Types: Occupancy Groups: Fire Sprinklered? Cool Roof Total Fees paid for Permit; Converted Area: VB. A2,F2.B,M.S2 Yes No 194,605.26 People Associated with Project: Owner JAPOS INC WIN-DOR INC 2220 E ORANGEWOOD AVE ANAHEIM CA 92806- 1787 POMONA RD STE K CORONA CA 92880 1235 N TUSTIN AVENUE ANAHEIM CA 92807 1235 N TUSTIN AVE ANAHEIM CA 92807 2525 E BURNSIDE ST PORTLAND OR 97214 18662 MCCARTHUR BLVD STE 200 IRVINE CA 92612 MCCARTHUR BLVD STE 200 IRVINE CA 92612 2850 SATURN ST BREA CA 92821 0000 Engineer Engineer Engineer Engineer Engineer Engineer Contractor Permit Applicant MOHEB D FARAH STAVROS CHRYSOVERGIS PANAJOTIS S CHRYSOVERGIS SIDNEY L SCOTT GARY STEPHENS WILLIAM E NEAL BERGMAN KPRS LLC JIM LINDQUIST Qty TypeElectricalFixtures Plumbing Fixtures Qty Type Mechanical Fixtures QtyType Meter/Disc Sw -<600 V,over 1000 amps Sub Panel/Temp Pwr -<600 V,0 <amps <=200 Receptacle,switches,lights Motors -up to 1 h.p. Motors -over 1 h.p.to 10 h.p. Pole Light (with one fixture) 1 Backflow Exterior -over 2 inch Backflow Interior -2 inch or less Lavatory Water Closet Urinal Kitchen Sink Garbage Disposal Repair/Drainage Alteration/Vent Piping Floor Drain Floor Sink Service,Mop,Slop Sink Grease Interceptor/Trap Boiler -up to 15 h.p. Dishwasher Water Heater Bar Sink Drinking Fountain Water Distribution Miscellaneous Fixture Gas System (1-5 outlets) Gas System (1-5 outlets) Sewer per 100 ft. Gas Yard Piping 1 Compressor/Boiler-up to 15 hp Commercial Systems per 1,000 sq ft Heating/Cooling Coil Evaporative Cooler (not portable) Evaporative or Air Cooled Condenser Ventilation Fan -<=300 cfm on single duct Ventilation Fan ->300 cfm on single duct Factory Built Fireplace Chimmey Combustion Products Vent Air Handling Units Commercial Hoods (including ducts) 11 8 1 34 12 104951124310 16 2 2 8 2 7 1 5 34 2 31 12 2 4 1 1 3 1 24 1 1 1 26 1 20 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work.fbld_permii_combo FINAL INSPECTIONS DATE INSPECTORCityofAnaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test n -2on 7 Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been sioner!—1 '/71 j)/)—Fire Dept.Final (714)765-5041TPlumbing(Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)^’/it/,y 2-Electrical Ground Eiectrode/Ufer (Footings)^Setback/Forms/T renches COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items h|ve been Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas Mechanical (Groundwork)PARTIAL INSPECTIONS Electrical (Underground Conduit)Buildino Inspections ^ Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/GIrders)u-8'i7 4 ^r . Underfloor Insulation (Raised Foundation Only)'2^-1 7 S>-AA ^cAir Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been ^i~r- 1st Floor Shear Firesprinkler (Rough)(Fire Dept.)Mechanical Inspections o-3c-'tr i^«/6rs c/g ■2nd Floor Shear aphragtr(R^^^ Masonry (Reinf./Bond Beam/Pre-Grout)f 3Roof(Sheathing/Di Rough Plumbing (Top Out)I ■v:mi biwmmimmtRoughDuct(Mechanical) Rough Mechanical Rough Electrical Rough COAMitagation Measures Plumbing inspections Framing (Only after PIbg.,Ele..Mec.&Fire)11 7 Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been si^ed- nlfijn l^SSlDrywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath nmExteriorLath Electrical inspections Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction min Exterior Plaster (Brown Coat)rj..ArK £-)/rtn>a.<.m. mmiiwmm T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor fl :..I 'Hill ■■Tt Sewer Water Engineering Backflow (Testable Only) Water Service