2210 E. ORANGEWOOD AVEPermit Types
BLD ELE MEC PLM
XX X X
Permit Number:BLD2016-05693
Issued;06/02/2017 CITY OF ANAHEIM
INSPECTION REQUEST LINE:
(714)765-4626
Quarter Section;119
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765 -5153
Site Address:2210 E ORANGEWOOD AVE
Legal Description:P BK 30 PG 34 PAR 14
Project Description:Change of Use:9,620 sq.ft,of SI to A2 occupancy indoor kitchen/seating.6,400 sq.ft,outdoor
patio/assembly area.705 sq.ft,to install (3)awnings.15,830 sq.ft.SI to FI for production/warehouse (cold warehouse).Convert
3,913 sq.ft.SI to B occupancy.886 sq.ft.2nd story addition to create conference room and storage room.REF:
BLD2017-02222;BLD2017-02223;BLD2017-02224
New /Additional Area;698 29,363 $50,000.00Valuation:
Construcion Types:
Occupancy Groups:
Fire Sprinklered?
Cool Roof
Total Fees paid for Permit;
Converted Area:
VB.
A2,F2.B,M.S2
Yes
No
194,605.26
People Associated with Project:
Owner JAPOS INC WIN-DOR INC 2220 E ORANGEWOOD AVE ANAHEIM CA 92806-
1787 POMONA RD STE K CORONA CA 92880
1235 N TUSTIN AVENUE ANAHEIM CA 92807
1235 N TUSTIN AVE ANAHEIM CA 92807
2525 E BURNSIDE ST PORTLAND OR 97214
18662 MCCARTHUR BLVD STE 200 IRVINE CA 92612
MCCARTHUR BLVD STE 200 IRVINE CA 92612
2850 SATURN ST BREA CA 92821 0000
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Contractor
Permit Applicant
MOHEB D FARAH
STAVROS CHRYSOVERGIS
PANAJOTIS S CHRYSOVERGIS
SIDNEY L SCOTT
GARY STEPHENS
WILLIAM E NEAL
BERGMAN KPRS LLC
JIM LINDQUIST
Qty TypeElectricalFixtures Plumbing Fixtures Qty Type Mechanical Fixtures QtyType
Meter/Disc Sw -<600 V,over 1000 amps
Sub Panel/Temp Pwr -<600 V,0 <amps
<=200
Receptacle,switches,lights
Motors -up to 1 h.p.
Motors -over 1 h.p.to 10 h.p.
Pole Light (with one fixture)
1 Backflow Exterior -over 2 inch
Backflow Interior -2 inch or less
Lavatory
Water Closet
Urinal
Kitchen Sink
Garbage Disposal
Repair/Drainage Alteration/Vent Piping
Floor Drain
Floor Sink
Service,Mop,Slop Sink
Grease Interceptor/Trap
Boiler -up to 15 h.p.
Dishwasher
Water Heater
Bar Sink
Drinking Fountain
Water Distribution
Miscellaneous Fixture
Gas System (1-5 outlets)
Gas System (1-5 outlets)
Sewer per 100 ft.
Gas Yard Piping
1 Compressor/Boiler-up to 15 hp
Commercial Systems per 1,000 sq ft
Heating/Cooling Coil
Evaporative Cooler (not portable)
Evaporative or Air Cooled Condenser
Ventilation Fan -<=300 cfm on single duct
Ventilation Fan ->300 cfm on single duct
Factory Built Fireplace Chimmey
Combustion Products Vent
Air Handling Units
Commercial Hoods (including ducts)
11
8 1 34
12 104951124310
16 2 2
8 2 7
1 5
34 2
31 12
2 4
1
1
3
1
24
1
1
1
26
1
20
1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of
permit issuance.A new permit is required to commence or continue work.fbld_permii_combo
FINAL INSPECTIONS DATE INSPECTORCityofAnaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test n -2on 7
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been sioner!—1 '/71 j)/)—Fire Dept.Final (714)765-5041TPlumbing(Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)^’/it/,y 2-Electrical Ground Eiectrode/Ufer
(Footings)^Setback/Forms/T renches COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items h|ve been Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
Mechanical (Groundwork)PARTIAL INSPECTIONS
Electrical (Underground Conduit)Buildino Inspections ^
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/GIrders)u-8'i7 4 ^r .
Underfloor Insulation (Raised Foundation Only)'2^-1 7 S>-AA ^cAir
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been ^i~r-
1st Floor Shear
Firesprinkler (Rough)(Fire Dept.)Mechanical Inspections
o-3c-'tr i^«/6rs c/g ■2nd Floor Shear
aphragtr(R^^^
Masonry (Reinf./Bond Beam/Pre-Grout)f
3Roof(Sheathing/Di
Rough Plumbing (Top Out)I ■v:mi biwmmimmtRoughDuct(Mechanical)
Rough Mechanical
Rough Electrical
Rough COAMitagation Measures Plumbing inspections
Framing (Only after PIbg.,Ele..Mec.&Fire)11 7
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been si^ed-
nlfijn l^SSlDrywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
nmExteriorLath Electrical inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction min
Exterior Plaster (Brown Coat)rj..ArK £-)/rtn>a.<.m.
mmiiwmm
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
fl :..I 'Hill ■■Tt
Sewer
Water Engineering Backflow (Testable Only)
Water Service