Loading...
3151 W. MONROE AVEPermit Types CITY OF ANAHEIMPLMBLDELEMEC X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2022-04033 Issued:08/26/2022 www.anaheim.net/building (714)765-4626 Quarter Section:8 Site Address:3151 W MONROE AVE,ANAHEIM,CA 92801 Legal Description:N TR 1820 BLK LOT 128 APN:13523233 Project Description:Reroof:Remove existing material,re-sheathe as necessary,and install (20)squares of composition shingles for the front building of residence 1 12.000.00NumberofStones:Valuation:Livir>g Area; Garage Area; Carport Area; Balcony /Deck Area: Cool Roof; HIAConstructionTypes: Occupancy Groups: Fire Sprinklered: Total Feat paid for Permit:340.56 People Associated with Project: Permit Applicant Owner Heriberto Alcantar HIKES JANET E 3151 W MONROE AVE Type Qty Type Qty Mechanical Fixtures QtyElectricalFixturesPlumbingFixtures The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been <;innf>c1 Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.)PhKMlT EXPIRED INSPECIIONFloor(Joist/Girders) Underfloor Insulation (Raised Foundation Only) MOT COMPLETEDFloorNailing(Raised Foundation Only) 2nd Floor (Floor Nailing)rrfrDonotcoverorconcealtheworkbelowuntilthefollowingapplicableitemshave been signed: DATF-. 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor rPoxiQl backfill unless signed offi Sewer Water Engineering Backflow (Testable Only) Water Service