4812 E. WOODWIND WAYPermit Types CITY OF ANAHEIMPLMBLDELEMEC
X
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2023-06476
Issued:12/06/2023
www.anaheim.net/building
{714)765-1626
Quarter Section:171
Site Address:4812 E WOODWIND WAY,ANAHEIM,CA 92807
Legal Description:N TR 5989 BLK LOT 34
APN:34307104
Project Description:Patio Cover:264 sq ft to construct attached enclosed patio with electrical
20,000.000Valuation;Number of Stories:Living Area:
Garage Area:
Carport Area:
Balcony /Deck Area:
Cool Roof:
N/AConstructionTypes:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:669.60
People Associated with Project:/
5036 WOODLEY AVE200505261106105920 ENCINO,CA 91436Contractor
Permit Applicant
Owner
CANOPY CONCEPTS INC
Jeanelle Heaston
GITTENS,ROSE 4812 WOODWIND WAY
Mechanical Fixtures QlyQtyQtyTypePlumbingFixturesElectricalFixturesType
he permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
ate of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
XElectricalFinal
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the foilwing applicable items have been
j^ioned Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building Inspections iElectrical(Underground Conduit)
Pre-slab {Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after Plbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &Plbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
11 >n nr.t h^ir.kfill unless sKinn'l of!
Sewer
Water Engineering Backflow (Testable Only)
Water Service