Loading...
3303 W. DEERWOOD DRPermit Types CITY OF ANAHEIMPLMBLDELEMEC X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2021-04928 Issued:11/09/2021 www.anaheim.net/building (714)765-4626 Quarter Section:6 Site Address:3303 W DEERWOOD DR Legal Description:N TR 2839 BLK LOT 21 APN:07944006 Project Description:Residential Remodel:Change out (5)retrofit windows,no size changes. 0LivingArea; Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: Number of Stories:Valuation: Construction Types; Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: 4.333.90 N/A 167,00 People Associated with Project: Contractor Permit Applicant Owner HOME DEPOT U S A INC DBA THE HOME DEPO P O BOX 105451 ,ATTN LICENSE MANAGEMENT ATTN LICENSE MANAGEMENT ATLANT/ Kevin Boyle MC GIFFIN GARY 3303 W DEERWOOD DR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit Is required to commence or continue work. INSPECTORFINALINSPECTIONSDATE City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the foilwing applicable items have been signed:^^ Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit)PERMIT EXPIREDPre-slab (Compaction/Membrane Reinf.) INSPECTIONFloor(Joist/Girders) NOT COMPI FTFHUnderfloorInsulation(Raised Foundation Only) Floor Nailing (Raised Foundation Only) /^/>72ndFloor(Floor Nailing)DATE:Do not cover or conceal the work below until the following applicable items have b->:n signed:,, 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathlng/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after Plbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &Plbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor I p,-',-f>t hqnkffll unlr-ss ntt> Sewer Water Engineering Backflow (Testable Only) Water Service