Loading...
1322 S GARRETT ST (2)Permit Types CITY OF ANAHEIMPLMBLDELEMEC A BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2022-05185 Issued:11/01/2022 www.anaheim.net/building (714)765-4626 Quarter Section:11 Site Address:1322 S GARRETT ST,ANAHEIM,CA 92804 e.*Tt.^45S Legal Description:N TR 2615 BLK LOT 20 APN:07958205 '●vV ; Project Description:Reroof:Remove existing to Install (26)sq of composition shingles over house and attached garage 1 21.000-00Valuation; Construction Types; Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: Living Area: Garage Area: Carport Area; Balcony /Deck Area: Cool Roof: Number of Stories: N/A 342,73 People Associated with Project: Permit Applicant Owner Ruth Casilan CASILAN LORENZO &RUTH 1322 S GARRETT ST Qty Type Qty Mechanical Fixtures QtyTypeElectricalFixturesPlumbingFixtures The permit shall expire by limitation and become null and void if the building or work has not passed final Inspection 365 days from the date of permit Issuance.A new permit Is required to commence or continue work. FINAL INSPECTIONS DATE INSPECTOR City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION Do not pour concrete until the following applicabie items have been signed;Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been sionecl Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Permit lxpirld—ingpection—not completed Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing)H /o 1Donotcoverorconcealtheworkbelowuntilthefollowingapplicableitemshave been signed DATE; 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed; Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor iUu not tinckfill unless siani:;d.Qtli Sewer Water Engineering Backflow (Testable Only) Water Service