Loading...
3283 W. BALL RDPermit Types 7/CITY OF ANAHEIMPLMMECBLDELE X X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-S153 Permit Number:BLD2022-02748 Issued:06/21/2022 www.anaheim.net/building (714)765-4626 Quarter Section:6 Site Address:3283 W BALL RD.ANAHEIM.CA 92804 Legal Description:N TR 14575 BLK LOT 1 UN 4 TRACT 14575,LOT 1 OF PR APN:93620425 Project Description:Residential Remodel:Replace acrylic walls and plumbing for shower at master bathroom. Numtwr of Stoneai.1LivingArea: Garage Area: Carport Area: Balcony /Deck Area: Cooi Roof: Valuation:6,700.00 N/AConstructionTypes: Occupancy Groups: Fire Sprinklered: Total Pees paid for Permit:213.87 People Associated with Project: Contractor Permit Applicant Owner 5515 E LA PALMA AVE SUITE 250ABCDE11161260 ANAHEIM.CA 92806REBORNCABINETSDBAREBORNBATHSOL Luba Batioff LAKEY SHELIA RENEE 3283 W BALL RD Type Electrical Fixtures Qty Type Qty Mechanical FixturesPlumbingFixtures Qty Shower The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the foilwing applicable items have been signed .Building Final (714 765-5153) /«Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit)“ERMIT EXPIRED INSPECTION Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) NOT COMPLETEDUnderfloorInsulation(Raised Foundation Only) Floor Nailing (Raised Foundation Only) C?/7.1 .22ndFloor(Floor Nailing)DATE:Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out)2i Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagatlon Measures Framing (Only after PIbg.,Ele..Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor (Do.not barkfill unless siunod ofO Sewer Water Engineering Backflow (Testable Only) Water Service