Loading...
1974 W. CLIPPER LNCITYtoFPermitTypes ANAHEIMPLMBLDELEMEC X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765 -5153 Permit Number:BLD2023-05571 Issued:10/24/2023 9/www.anaheim.net/building {714)765-4626 Quarter Section;37 Site Address:1974 W CLIPPER LN,Anaheim,CA 92801 Legal Description;N TR 11818 BLK LOT 3 UN 94 TR 11818 LOTS UNIT 94 APN:93072199 Project Description;EV Charger Level 2 0NumberofStories:0.00LivingArea: Garage Area; Carport Area: Balcony!Deck Area: Valuation: Construction Types: Occupancy Groups: Fire Spnnklered: Total Fees paid for Permit: N/A No 172.00CoolRoof: People Associated with Project: Permit Applicant Owner Sean Lee LEE SEAN YOUNG-BONG 1974 W CUPPER LN «94 Qty Type Plumbing Fixtures Qty Mechanical Fixtures QtyTypeElectricalFixtures EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS All applicable items below must be signed before utilities are released Building Division Final Gas Test j-LElectricalFinal Plumbing Final Mechanical Final Cross Connection Control (714)765*4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable Items have been suineO Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the v/ork below until the following applicable items have been signed:^^ 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after Plbg.,Ele..Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable ilems have been signed: Drywall Drywall Penetrations (Ele,Mec &Plbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meler will be set within 2-3 business days after approval)Excludes Now Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor iDn nol harkfill unless.sianpd off Sewer Water Engineering Backflow (Testable Only) Water Service