Loading...
2743 W BROADWAY (2)Permit Types CITY OF ANAHEIMPLMBLDELEMEC X BUILDING DIVISION 200 S.ANAHEIM BLVD. f714)765-5153 Permit Number:BLD2022-0S924 Issued:12/15/2022 www.anaheim.net/building (714)765-4626 Quarter Section:20 Site Address:2743 W BROADWAYANAHEIM,CA 92804 Legal Description:N TR 2832 BLK LOT 8 APN;12657111 Project Description:Plumbing for Redrain for kitchen and laundry. 0 Valuation: Construction Types: OccuparKy Groups: Fire Sprinklered: Total Fees paid for PermH: 0.00NumberofStories:Living Area: Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: N/A 167.00 People Associated with Project: 3150 E BIRCH ST200205291032294650 BREA,CA 92821Contractor Permit Applicant Owner SERVICE CHAMPIONS PLUMBING HEATING & Ben Medina GOVE ANGELICA TR 2743 W BROADWAY Mechanical Fixtures QtyQtyTypeQtyTypeElectricalFixturesPlumbingFixtures Repair/Drainage AlterationAfent Piping The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the foilwing applicable items have been signed Building Final (714 765-5153) Last Inspection-Final Only After Above Completed 7-r^z.jPlumbing(Ground/Underfloor Water)( Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed: 1st Floor Shear Mechanical inspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct,Ele.,or Mec.) Grease Interceptor iDq not barkfill u'lless siaried off) Sewer Water Engineering Backflow (Testable Only) Water Service