2131 W CHATEAU AVEPermit Types CITY OF ANAHEIMPLMMECBLDELE
X
BUILDING DIVISION
200 S.ANAHEIM BLVO.
(714)765 -5153
Permit Number:BLD2023-04818
Issued;09/15/2023
www.anaheim.net/building
(714)765-4626
Quarter Section:41
Site Address:2131 W CHATEAU AVE,Anaheim,CA 92804
Legal Description:N TR 2537 BLK LOT 76
APN:12832107
Project Description:Reroof:To remove and install (2800)sq.ft of composition and shingles over house and attached garage
1 16,375.00LivingArea;
Garage Area:
Carport Area:
Balcony /Deck Area:
Cool Roof:
Number of Stories:Valuation:
N/AConstructionTypes:
Occupancy Groups:
Fire Sprinklered:
Total Foes paid for Permit:355.13
People Associated with Project:
3360 FLAIR DR STE 101 EL MONTE,CA 90731Contractor
Permit Applicant
Owner
CITIWIDE BUILDERS INC
Carlos Valle
MEJIA.JUAN FRANCISCO &ANABELLA 2131 W CHATEAU
Qty TypeTypeElectricalFixtures Plumbing Fixtures Qty Mechanical Fixtures Qty
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONSCityofAnaheimBuildingDivisionAllapplicableitemsbelowmustbesignedbeforeutilitiesarereleasedFinalGasTestElectricalFinalPlumbingFinalMechanicalFinalCrossConnectionControl(714)765-4280Donotoccupythisbuildinguntilthefinalinspectionshavebeenmade.Engineering Final (714)765-5126FireSprinkler(ONLY)(714)765-5041DATEINSPECTORINSPECTIONDonotpourconcreteuntilthefollowingapplicableitemshavebeensigned:Fire Dept.Final (714)765-5041WaterEngineering(714)765-4591Plumbing(Ground/Underfloor Drain Waste)
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:^^
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
iv->t hnrkfill unless signed off)H:
Sewer
Water Engineering Backflow (Testable Only)
Water Service