Loading...
830 S DANBROOK DR (4)Permit Types RED 1 ELE I MEC I PLM X Permit Number: BLD2023-03527 Issued: 07/17/2023 www.anaheim.net/building (714)765-4626 Quarter Section: 6 Site Address: 830 S DANBROOK DR, ANAHEIM, CA 92804 Legal Description: N TR 2839 BLK LOT 158 APN: 07942507 Project Description: Residential EV Charger Living Area: Garage Area: Carport Area: Balcony / Deck Area: Cool Roof: People Associated with Project CITY OF ANAHEIM Number of Stones: BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 •5153 7i 1 Valuation: construction Types: Occupancy Groups: Fire Spnnklered: Total Fees pald for Permit: 0.00 N/A 167.00 Contractor ANDREW S HAVICAN 5612 VONNIE LN201404171302175025 CYPRESS, CA 90630 Permit Applicant Andrew SHavican Owner CHAT, MICHAEL A 8 SHIRLEY M 830 S DANBROOK DR Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. P�PHel4t Cdt Cityof Anaheim DF iO Building Division h i > �DVNo6D tey^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTL All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed. Fire Dept. Final (714) 765.5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signedBuilding Final (714 765-5153) Last Inspection -Final Only After Above Completed -z Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg.. Ele.. Mec. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed'. Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New r.nnctra fin" Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service