830 S DANBROOK DR (4)Permit Types
RED 1 ELE I MEC I PLM
X
Permit Number: BLD2023-03527
Issued: 07/17/2023
www.anaheim.net/building
(714)765-4626
Quarter Section: 6
Site Address: 830 S DANBROOK DR, ANAHEIM, CA 92804
Legal Description: N TR 2839 BLK LOT 158
APN: 07942507
Project Description: Residential EV Charger
Living Area:
Garage Area:
Carport Area:
Balcony / Deck Area:
Cool Roof:
People Associated with Project
CITY OF ANAHEIM
Number of Stones:
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 •5153
7i
1 Valuation:
construction Types:
Occupancy Groups:
Fire Spnnklered:
Total Fees pald for Permit:
0.00
N/A
167.00
Contractor ANDREW S HAVICAN 5612 VONNIE LN201404171302175025 CYPRESS, CA 90630
Permit Applicant Andrew SHavican
Owner CHAT, MICHAEL A 8 SHIRLEY M 830 S DANBROOK DR
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
P�PHel4t Cdt
Cityof Anaheim DF iO
Building Division h i
>
�DVNo6D tey^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTL
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765.5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
signedBuilding
Final (714 765-5153)
Last Inspection -Final Only After Above Completed
-z
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sioned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg.. Ele.. Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed'.
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
r.nnctra fin"
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service