Loading...
325 S GAIN STPermit Types CITY OF ANAHEIMPLMBLDELEMEC X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2023-04781 Issued:09/14/2023 www.anaheim.net/building (714)765-4626 Quarter Section:27 Site Address: 325 S GAIN ST,ANAHEIM.CA 92804 Legal Description:N TR 2440 BLK LOT 6 APN:12715109 Project Description:Reroof:Remove existing to install (25)sq of composition shingles over entire house and attached garage,and (5) sq of flat roof over patio 6,000.001Valuation:Number of Stories:Living Area: Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: VBConstruction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit:349.78 People Associated with Project: Permit Applicant Owner Eric Tran TRAN, CALVIN N 325 S GAIN ST QtyMechanicalFixturesQtyPlumbingFixturesQtyTypeElectricalFixturesType The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. FINAL INSPECTIONS DATE INSPECTORCityofAnaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)76S-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underftoor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the foilwing applicable items have been signed Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)/- Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed’ 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease interceptor iDq not backfill unless sicmert o(li Sewer Water Engineering Backflow (Testable Only) Water Service