Loading...
822 N JANSS STPermit Types BLD ELE MEC PLM X X Permit Number: BLD2023-01875 Issued: 08/08/2023 www.anaheim.net/bu ilding (714)765r1626 Quarter Section: 71 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765. 5153 Site Address: 822 N JANSS ST, ANAHEIM, CA 92805 Legal Description: N TR 375 ELK B LOT 4 TR 375 LOT 4 BLK B(N1/2 LOT 5 APN:03419309 Project Description: Residential Remodel: 339 sq. ft. to convert family room into new bedroom, bathroom and dining room into new pantry and laundry room. Living Area: Number of Stories: 1 valuation: Garage Area: Consirucaon Types: Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: People Associated with Project: Permit Applicant Thanh MlnhNguyen Owner Thanh Minh Nguyen 822 Jonas Engineer - Civil AMGAD S BENJAMIN 24310 MOULTON PKVVV STE 0-105 LAGUNA HILLS, CA 92637 8,500.00 VB No 2.253.11 Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Oty Floor Drain 1 The permit shall expire by limitation and become null and Void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. A�NEIM Cq Cityof Anaheim p� <�O Building Division _� i VNDEo tab^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final S Mechanical Final1TJT Cross Connection Control (714) 765-0280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-5041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Formsrrrenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been qionpd Building Final (714 765-5153) Last Inspection -Final Only After Above Completed Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (JoisUGirders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical pil Rough Electrical y Rough COA/Mitagation Measures Plumbing Inspections S Gj�;y ti ./ �GP Ael 1 Framing (Only after Plbg_ Ele.. Mec. & Fire) Insulation(Sound/Energy) Do not tape or plaster until the following applicable items have been signed. �7 Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow, (Testable Only) Water Service