Loading...
321 N KODIAK ST A-DPermit Types BLD ELE MEC PLM X Permit Number: BLD2023-03039 Issued: 06/19/2023 www.anaheim.net/bu ilding (714)7654626 Quarter Section: 156 Site Address: 321 N KODIAK ST A-D, ANAHEIM, CA 92807 Legal Description: N TR 4643 BLK LOT 8 APN: 36017216 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD, (714) 765 - 5153 Project Description: Reroof: Overlay (42) squares of composition shingle for house over existing (1) layer of material. Living Area: Number of Stones: 0 Valuation: Garage Area: Construction Types: Carpon Area: Occupancy Groups: Balcony / Deck Area: Fire Sprnklered: Cool Roof. Total Feo paid for Permit: People Associated with Project: Contractor HI - TOP ROOF INC 15532 ILLINOIS AVENUE PARAMOUNT, CA Permit Applicant David Jimenez Owner NGUYEN, LIEM A 8 VI 2370 W CANOPY LN Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures 12,600.00 N/A 385 53 The permit shall expire by limitation and become null and void If the building or work has not passed Final Inspection 365 days from the date of permit issuance. A new permit Is required to commence or continue work. PHEl C Cityof Anaheim OF P� q<�O Building Division h z • �o�NpEo yb`'^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714) 765-4280 Engineering Final (714) 765-5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor of pour floor slab until the follwing applicable items have been "rined I Building Final (714 765-5153) Last Inspection -Final Only After Above Completed ` 1 Plumbing (Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) Pre -slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do nol cover or conceal the work below until the following applicable items have been stoned 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Ro eathi iaphragm/Frame) c ' M (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg Ele Mec & Firer Insulation (SoundlEnergy) Do not tape or plaster until the fotlowtng applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter-i Meter will be set within 2-3 business days after aporovatl Excludes New Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor Sewer Water Engineering Backflow (Testable Only) Water Service