321 N KODIAK ST A-DPermit Types
BLD ELE MEC PLM
X
Permit Number: BLD2023-03039
Issued: 06/19/2023
www.anaheim.net/bu ilding
(714)7654626
Quarter Section: 156
Site Address: 321 N KODIAK ST A-D, ANAHEIM, CA 92807
Legal Description: N TR 4643 BLK LOT 8
APN: 36017216
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD,
(714) 765 - 5153
Project Description: Reroof: Overlay (42) squares of composition shingle for house over existing (1) layer of material.
Living Area: Number of Stones: 0 Valuation:
Garage Area: Construction Types:
Carpon Area: Occupancy Groups:
Balcony / Deck Area: Fire Sprnklered:
Cool Roof. Total Feo paid for Permit:
People Associated with Project:
Contractor HI - TOP ROOF INC 15532 ILLINOIS AVENUE PARAMOUNT, CA
Permit Applicant David Jimenez
Owner NGUYEN, LIEM A 8 VI 2370 W CANOPY LN
Type Electrical Fixtures City Type Plumbing Fixtures City Mechanical Fixtures
12,600.00
N/A
385 53
The permit shall expire by limitation and become null and void If the building or work has not passed Final Inspection 365 days from the
date of permit issuance. A new permit Is required to commence or continue work.
PHEl C
Cityof Anaheim OF P� q<�O
Building Division h z
• �o�NpEo yb`'^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed
Fire Dept. Final (714) 765-6041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor of pour floor slab until the follwing applicable items have been
"rined I
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
` 1
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do nol cover or conceal the work below until the following applicable items have
been stoned
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Ro eathi iaphragm/Frame)
c
'
M (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg Ele Mec & Firer
Insulation (SoundlEnergy)
Do not tape or plaster until the fotlowtng applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-i Meter will be set within 2-3
business days after aporovatl Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service