787 S MOSAIC ST (3)Permit Types
BLD ELE MEC PLM
X
Permit Number; BLD2023-02936
Issued: 06P3i2023
www.anaheim.neUbuilding
(714)765-1626
Quarter Section: 94
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765-5153
Site Address: 787 S MOSAIC ST, Anaheim, CA 92805
Legal Description: N TR 18101 BLK LOT 23 POR OF LOT 23 OF TRACT 18101
APN:03731040
Project Description: Residential EV Charger Level 2
Living Area: Number of Stories:
Garage Area:
Carport Area:
Balcony / Deck Area:
Cool Roof:
Valuation: 0.00
Construction Types:
Occupancy Groups:
Fire Sprinldered:
Total Fees paid for Permit: 0.00
People Associated with Project:
Contractor TROUT ELECTRIC 2020 IOWA AVE,SUITE 102 RIVERSIDE, CA 92504
Permit Applicant TROUT ELECTRIC 17843 GLEN HOLLOW WAY RIVERSIDE, CA 92504 0000
Type Electrical Fixtures Qty Type Plumbing Fixtures ally Mechanical Fixtures Qty
EV Charger 1
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit Is required to commence or continue work.
P�pNEIM C9C
City of Anaheim o� io
Building Division F i
u >
�DUNDED �ah�
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS DATE INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION DATE INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-5041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 7654591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COAIMigation Measures
Do not install subfloor or pour floor slab until the follwing applicable items have been
sionedn
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been
let Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mec. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter-(Meter will be set within 2-3
business days after approval) Excludes New
nirtinn
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)
Water Service