1152 S POSITANO AVEPermit Types CITY OF ANAHEIMPLMBLD,ELE MEC
X
BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2023-04745
Issued:09/13/2023
www.anaheim.net/building
(714)765-4626
Quarter Section:221
Site Address:1152 S POSITANO AVE,ANAHEIM.CA 92808
Legal Description:N TR 12697 BLK LOT 7 UN 140 TRACT 12697,LOT 7 OF
APN:93044550
Project Description:Residential EV Charger Level 2
0.00Valuation:Living Area:
Garage Area:
Carport Area:
Balcony /Deck Area:
Cool Roof:
Number of Stories:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:0.00
People Associated with Project:
180 N.ROSE BLOSSOM LANE ANAHEIM,CA 92807Contractor
Permit Applicant
C2 ELECTRIC
Zoltan Csernus
Qty.Type Qty Mechanical Fixtures QtyTypeElectricalFixturesPlumbingFixtures
1EVCharger
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste)
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the foilwing applicable items have been
signed:^ Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg..Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywail Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(MeterwiII be set within 2-3
business days after approval)Excludes New
Construction
Exterior Piaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
iHn not backfill unless siGnrd off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service
PRODUCT OVERVIEW
This manual applies to Wall Connectors identified by part number 1457768-**-*.
Product Specifications
Nominal 200-240 V AC single-phase
12 -48 amps
12-4 AWG (3.5 -25 mm^).copper only
W (21 mm)default,1"(27 mm)optional
TN/TT
50/60 Hz
8.5'(2.6 m)or 18’(5.5 m)
Voltage and Wiring
Current Output Range
Terminal Blocks
Supported Conduit Sizing
Grounding Scheme
Frequency
Cable Length
Wall Connector Dimensions
Height;13.6”(345 mm)
Width:6.1”(155 mm)
Depth;4.3”(110 mm)
Wire Box Bracket Dimensions
Height:9.8”(250 mm)
Width;4.7”(120 mm)
Depth:2.0”(50 mm)
10 lb.(4.5 kg)
-22"F to 122“F (-30°C to SOX)
-40"F to 185°F (-40X to 85X)
Type 3R
Weight (including wirebox)
Operating Temperature
Storage Temperature
Enclosure Rating
Ventilation Not required
Externa!branch circuit breakerMeansofDisconnect
Integrated,no additional required (CCID20)
2.4 GHz,802.11b/g/n
cULus -E351001
Ground Fault Circuit Interrupter
Wi-Fi
Agency Approvals
Transportation and storage:Ensure that Wall Connector is within storage temperature when moving
transporting,or storing.
This device complies with part 15 of the FCC Rules.Operation is subject to the following conditions:(1)
This device may not cause harmful interference,and (2)this device must accept any interference
received,including interference that may cause undesired operation.
4 Gen 3 Wall Connector Manual