Loading...
5801 E PASEO DEL LEON (2)Permit Types CITY OF ANAHEIMPLM AELEMECBLD . X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765 -5153 Permit Number:BLD2023-04985 Issued:mi2m02Z www.anaheim.net/building (714)765^626 Quarter Section:185 Site Address:5801 E PASEO DE LEONANAHEIM,CA 92807 Legal Description:N TR 7769 BLK LOT 154 APN:36318443 l^EOJ Project Description:Residential for EV Charger located outside 0.001NumberofStories:Valuation:Living Area: Garage Area: Carport Area; Balcony /Deck Area; Cool Roof; N/AConstructionTypes: Occupancy Groups: Fire Sprinklered; Totai Fees paid for Permit:219.00 People Associated with Project: Permit Applicant Owner Jimmy Go GO,JIMMY 5801 E PASEO DELEON QtyQtyMechanicalFixturesQtyTypePlumbingFixturesElectricalFixturesType 1EVCharger The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit Is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the foilwing applicable items have been^signed Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele..Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct,Ele.,or Mec.) Grease Interceptor (Do not backfill unless signed off) Sewer Water Engineering Backflow (Testable Only) Water Service