Permit Number: BLD2023-01934
Issued: 09/27/2023
www.anaheim. neUbu ilding
(714)765-4626
Quarter Section: 124
CITY OF ANAHEIM
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Site Address: 900 S SUNKIST ST, Anaheim, CA 92806
Legal Description: S TWP 4 RGE 10 SEC 13 SEC 13 T 4 R 10 POR NE1/4
APN: 25335214 -
Project Description: Antenna Cell Site: Install new diesel generator on concrete pad within new 108 In ft x 8It CMU wall enclosure for
existing cell site "AT&T".
Living Area: Number of Stories: 1 Valuation: 20.000.00
Garage Area: Construction Types: WA
Carport Area: Occupancy Groups:
Balcony / Deck Area: Fire Spnnklered:
Cool Roof: Total Fees paid for Permit: 1,969.05
People Associated with Project:
Contractor GENERAL DYNAMICS INFORMATION TECHNO 101 STATION DR #D05202009290906577344 WESTWOOD, MA 02090
Permit Applicant Adrian Cancino
Owner SOUTHEASTERN CA CONFERENCE SEVENTH PO BOX 79990
Engineer - Civil AUREZA MASHHADI ALI 4675 MACARTHUR COURT, SUITE 1150 NEWPORT BEACH, CA 92660
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
Apparatus or equipment not listed 1
Generators/Transformers - over 10 hp, 1
over 75 kva
Receptacle, switches, lights 6
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance. A new permit is required to commence or continue work.
PNpHEtM C
City of Anaheim �q
of io
Budding DIVI$lon h z
u a
�ooNpEp 18�^
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
r
Plumbing Final
Mechanical Final
Cross Connection Control (714) 766.4280
Engineering Final (714) 765.5126
INSPECTION
I DATE
I INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed:
Fire Dept. Final (714) 765-6041
Plumbing (Ground/Underfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
AnSub
Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install subfloor or pour floor slab until the follwing applicatilpilK been
sioned
Building Final (714 766.5153)
Last Inspection -Final Only After Above Completed
Tr�C'
J �%
Plumbing (Ground/Underfloor Water)
Undernoor Rough Gas
PARTIAL INSPECTIONS
Building Inspections
Mechanical (Groundwork)
Electrical (Underground Conduit)
I
Pre -slab (Compaction/Membrane Reinf.)
Floor (Jolst(Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sianed
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Rough COA/Mitagation Measures
Plumbing Inspections
Framing (Only after Plbg., Ele., Mee. & Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed
Drywall
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
fDo not backfill unless sinned off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service