Loading...
900 S SUNKIST ST (4)Permit Types BLD ELE MEC PLM X X Permit Number: BLD2023-01934 Issued: 09/27/2023 www.anaheim. neUbu ilding (714)765-4626 Quarter Section: 124 CITY OF ANAHEIM BUILDING DIVISION 200 S. ANAHEIM BLVD. (714) 765 -5153 Site Address: 900 S SUNKIST ST, Anaheim, CA 92806 Legal Description: S TWP 4 RGE 10 SEC 13 SEC 13 T 4 R 10 POR NE1/4 APN: 25335214 - Project Description: Antenna Cell Site: Install new diesel generator on concrete pad within new 108 In ft x 8It CMU wall enclosure for existing cell site "AT&T". Living Area: Number of Stories: 1 Valuation: 20.000.00 Garage Area: Construction Types: WA Carport Area: Occupancy Groups: Balcony / Deck Area: Fire Spnnklered: Cool Roof: Total Fees paid for Permit: 1,969.05 People Associated with Project: Contractor GENERAL DYNAMICS INFORMATION TECHNO 101 STATION DR #D05202009290906577344 WESTWOOD, MA 02090 Permit Applicant Adrian Cancino Owner SOUTHEASTERN CA CONFERENCE SEVENTH PO BOX 79990 Engineer - Civil AUREZA MASHHADI ALI 4675 MACARTHUR COURT, SUITE 1150 NEWPORT BEACH, CA 92660 Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty Apparatus or equipment not listed 1 Generators/Transformers - over 10 hp, 1 over 75 kva Receptacle, switches, lights 6 The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the date of permit issuance. A new permit is required to commence or continue work. PNpHEtM C City of Anaheim �q of io Budding DIVI$lon h z u a �ooNpEp 18�^ Do not occupy this building until the final inspections have been made. FINAL INSPECTIONS DATE INSPECTOR All applicable items below must be signed before utilities are released Final Gas Test Electrical Final r Plumbing Final Mechanical Final Cross Connection Control (714) 766.4280 Engineering Final (714) 765.5126 INSPECTION I DATE I INSPECTOR Fire Sprinkler (ONLY) (714) 765-5041 Do not pour concrete until the following applicable items have been signed: Fire Dept. Final (714) 765-6041 Plumbing (Ground/Underfloor Drain Waste) Water Engineering (714) 765-4591 Electrical Ground Electrode/Ufer AnSub Llst/Bus. Lic. (714) 765-5194 (Allow 10 business days) Setback/Forms/Trenches (Footings) COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicatilpilK been sioned Building Final (714 766.5153) Last Inspection -Final Only After Above Completed Tr�C' J �% Plumbing (Ground/Underfloor Water) Undernoor Rough Gas PARTIAL INSPECTIONS Building Inspections Mechanical (Groundwork) Electrical (Underground Conduit) I Pre -slab (Compaction/Membrane Reinf.) Floor (Jolst(Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sianed 1st Floor Shear Firesprinkler (Rough) (Fire Dept.) Mechanical Inspections 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Rough COA/Mitagation Measures Plumbing Inspections Framing (Only after Plbg., Ele., Mee. & Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed Drywall Drywall Penetrations (Ele, Mec & Plbg) Interior Lath Exterior Lath Electrical Inspections Electrical Service Meter -(Meter will be set within 2-3 business days after approval) Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct., Ele., or Mec.) Grease Interceptor fDo not backfill unless sinned off) Sewer Water Engineering Backflow (Testable Only) Water Service