Permit Number:BLD2023-00945
Issued:07/05/2023
www.anaheim.net/building
{714)765-4626
Quarter Section;108
Site Address:1925-1980 S STATE COLLEGE BLVD,Anaheim,CA 92805
Legal Description:P BK 388 PG 39 PAR 3 PM 388-39 PAR 3 POR OF
APN:08329303
Project Description:Tenant Improvement:Construct a demising walls at existing shell unit to create (2)separate shell units (#1925 State
College and 1980 Gene Autry ●total combined area 4,871 sq ft).Add interior partitions,place (2)un-connected rooftop air conditioning
units per suite and plumbing for gas line at each suite.
Living Area:
Garage Area:
Carport Area:
Balcony /Deck Area:
Cool Roof:
Number of Stories:0 Valuation:35,000.00
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
lA
3,021.80
People Associated with Project:
Contractor
Permit Applicant
Owner
Engineer -Mechanical
Engineer -Civil
2582 ASSOCIATED RD APT 1 FULLERTON.CAGALAN'S CONSTRUCTION &MAINTENA
Victor Galanfuentes
JEFFERSON AT STADIUM PARK
Raymond Duenas
RICHARD A PLUMP
600 E LAS COLINAS BLVD 1800
529 W SHADWELL ST LOS ANGELES,CA 90745
914 E KATELLA AVE ANAHEIM,CA 92805
Type Electrical Fixtures Qty Type QtyPlumbingFixtures Mechanical Fixtures Qty
Evaporative or Air Cooled Condenser
Gas System (outlets)
4
2
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
'Ji.m-Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Water Engineering (714)765-4591Plumbing(Ground/Underfl<y>r Drain Waste)
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed 7mPlumbing(Ground/Underfioor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Wnised-Teundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:^
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been sijned:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
(Do nol backfill utiless signed off)
Sewer
Water Engineering Backflow (Testable Only)
Water Service