Permit Number: BLD2023-04123
Issued: 08/11/2023
www.anaheim.net/building
(714)7654626
Quarter Section: 197
CITY OF ANAHEIM
Site Address: 306 S WHITESTONE DR, Anaheim, CA 92807
Legal Description: N TR 9524 BLK LOT 29
APN: 35628111
BUILDING DIVISION
200 S. ANAHEIM BLVD.
(714) 765 -5153
Project Description: Residential Remodel: Replace (1) bath tub with tile, (1) shower with tile, upgrade electrical, plumbing, and
mechanical fixtures in bathrooms and kitchen
Living Area: Number of Stories: 1 Valuation'
Garage Area: Construction Types:
CarportAreaOccupancy Groups:
Balcony / Deck Area: Fire Sprinklered:
Cool Roof. Total Fees paid for Permit:
People Associated with Project:
Contractor CONCEPT RENOVATIONS INC 16001 VENTURA BLVD STE 125 ENCINO, CA
Permit Applicant Edgar Alvarez
Owner NANDA,ASHISHTR 2053 GLENVIEW DR
34,000.00
N/A
No
770.42
Type Electrical Fixtures Oty Type Plumbing Fixtures Oty Mechanical Fixtures Qty
Receptacle, switches. lights 44 Bath Tub 1 Gas System (oullets) 1
Repair/Drainage Alteration/Vent Piping 1 Ventilation Fan - <= 300 cfm on single duct 3
Shower 1
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit Issuance. A new permit is required to commence or continue work.
P�?I EIM �4`
Cityof Anaheim O4 iO
Building Division L i
11
• �OV/VDEp tshA
Do not occupy this building until the final inspections have been made.
FINAL INSPECTIONS
DATE
INSPECTOR
All applicable Items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
VI,; IVA
Mechanical Final
Cross Connection Control (714) 765-4280
Engineering Final (714) 765-5126
INSPECTION I
DATE I
INSPECTOR
Fire Sprinkler (ONLY) (714) 765-5041
Do not pour concrete until the following applicable items have been signed.
Fire Dept. Final (714) 765-5041
Plumbing (GroundlUnderfloor Drain Waste)
Water Engineering (714) 765-4591
Electrical Ground Electrode/Ufer
Sub List/Bus. Lic. (714) 765-5194 (Allow 10 business days)
Setback/Forms/Trenches (Footings)
COA/Migation Measures
Do not install sub0oor or pour Floor slab until the follwing applicable items have been
Building Final (714 765-5153)
Last Inspection -Final Only After Above Completed
'l Irf
`U
X _
+1 �
Plumbing (Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONS
Buildina Inspections
A� �/-
�l Z� M%i S VM"I� 1/-1-41il VOPI-
Mechanical (Groundwork)
Electrical (Underground Conduit)
Pre -slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
4 Z`f
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
1st Floor Shear
Firesprinkler (Rough) (Fire Dept.)
Mechanical Inspections
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
7124 m
l
Rough Duct (Mechanical)
Rough Mechanical
5�
Ivur-h'
Rough Electrical
ll
Rough COAIMitagation Measures
Plumbing Inspections
Framing (Only after clog Ele.. Mec. & Fire)
�7A�
Insulation (Sound/Energy)
M-
Do not tape or plaster until the following applicable items have been signed:
Drywall
1-'1
TQOM-
Drywall Penetrations (Ele, Mec & Plbg)
Interior Lath
5 L3/
jCZQ�Z'
Exterior Lath
Electrical Inspections
Electrical Service Meter -(Meter will be set within 2-3
business days after approval) Excludes New
Exterior Plaster (Brown Coat)
T-Bar (Struct., Ele., or Mec.)
Grease Interceptor
Sewer
Water Engineering Backflow (Testable Only)