Loading...
2265 W. CRESTWOOD LNPermit Types HtJM c^MEC PLMBLDELE /X 1 Permit Number:BLD2019-04719 Issued:09/23/2019 CITY OF ANAHEIM BUILDING dIvISION 200 S.ANAHEIM BLVD. (714)765-5153 INSPECTION REQUEST LINE: (714)765-4626 Quarter Section;36 Site Address:2265 W CRESTWOOD LN Legal Description:N TR 2773 LOT 56 Project Description:Reroof:Remove existing material,resheath as necessary and install (24)squares of composition shingles onto house and attached garage. $7,600.00 N/A,, 339.99 Valuation: Construcion Types: Total Fees paid for Permit: People Associated with Project: Owner DAVID COSTELL 2265 CRESTWOOD ANAHEIM CA 92804-6425 3702 E CHAPMAN AVE C ORANGE CA 92869 0000Contractor Permit Applicant SAL -NB ROOFING SALVADOR BARAHONA Electrical Fixtures Qty TypeType Plumbing Fixtures Qty Type Mechanical Fixtures Qty The permit shali expire by iimitation and become nuii and void if the building or work has not passed finai inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work.fbld_permit_combo FINAL INSPECTIONS DATE INSPECTOR City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION Do not pour concrete until the following applicable items have been signed;Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the follwing applicable items have been S'Oncc!Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed:^^ 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed; Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor 'Do not r-ackf' Sewer inic??-sinnr-rl ntt Water Engineering Backflow (Testable Only) Water Service