2265 W. CRESTWOOD LNPermit Types HtJM c^MEC PLMBLDELE
/X
1
Permit Number:BLD2019-04719
Issued:09/23/2019 CITY OF ANAHEIM
BUILDING dIvISION
200 S.ANAHEIM BLVD.
(714)765-5153
INSPECTION REQUEST LINE:
(714)765-4626
Quarter Section;36
Site Address:2265 W CRESTWOOD LN
Legal Description:N TR 2773 LOT 56
Project Description:Reroof:Remove existing material,resheath as necessary and install (24)squares of composition shingles
onto house and attached garage.
$7,600.00
N/A,,
339.99
Valuation:
Construcion Types:
Total Fees paid for Permit:
People Associated with Project:
Owner DAVID COSTELL 2265 CRESTWOOD ANAHEIM CA 92804-6425
3702 E CHAPMAN AVE C ORANGE CA 92869 0000Contractor
Permit Applicant
SAL -NB ROOFING
SALVADOR BARAHONA
Electrical Fixtures Qty TypeType Plumbing Fixtures Qty Type Mechanical Fixtures Qty
The permit shali expire by iimitation and become nuii and void if the building or work has not passed finai inspection 365 days from the date of
permit issuance.A new permit is required to commence or continue work.fbld_permit_combo
FINAL INSPECTIONS DATE INSPECTOR
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION
Do not pour concrete until the following applicable items have been signed;Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
S'Oncc!Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:^^
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed;
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
'Do not r-ackf'
Sewer
inic??-sinnr-rl ntt
Water Engineering Backflow (Testable Only)
Water Service