Loading...
514 S. ANAHEIM BLVD 10Peirnit Types MECBLDELE PLM X Permit Number:BLD2021-00865 Issued:02/26/2021 CITY OF ANAHEIM INSPECTION REQUEST LINE; (714)765-4626 Quarter Section:84 BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Site Address:514 S ANAHEIM BLVD 10 Legal Description: Project Description:Residential EV charger Level 2 inside the garage $0.00Valuation: Construcion Types; Fire Sprinklered? Cool Roof Total Fees paid for Permit: N/A, No No 0.00 People Associated with Project: Owner NORIK DZHAND2HAPANYAN 514 S ANAHEIM BLVD 10 ANAHEIM CA 92805 Permit Applicant NORIK DZHANDZHAPANYAN Electrical Fixtures Qty Type Qty Type Mechanical Fixtures QtyPlumbingFixturesType EV Charger 1 The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work.fbld,permit,combo FINAL INSPECTIONS DATE INSPECTORCityofAnaheim Building Division All applicable Items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Eiectrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the follwing applicable items have been signed: Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas ^E R iBuildhamsoectlons —N^^ECTIQN Mechanical (Groundwork) Electrical (Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) NOT COMPLEIEDFloor(Joist/Girders) Underfloor Insulation (Raised Foundation Only) aFloorNailing(Raised Foundation Only) DATE:2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sioned: 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Piaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor ([Ju nol h;^rkfill iifiliTss -.icinnd ofl) Sewer Water Engineering Backflow (Testable Only) Water Service