Loading...
1639 W. CATALPA DRPermit Types CITY OF ANAHEIMPLMELEMECBLD X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765-5153 Permit Number:BLD2023-02386 Issued:05/16/2023 www.anaheim.net/building (714)765-4626 Quarter Section:52 Site Address:1639 W CATALPA DR,ANAHEIM.CA 92801 Legal Description:N TR 3372 BLK LOT 5 APN:03447203 Project Description:Re-roof:cover existing and install (28)sq.of composition shingles on entire house. 13,900.002Valuation; Construction Types: Occupancy Groups: Fire Sprinklered: Total Fees paid for Permit: Number of Stories:Living Area: Garage Area; Carport Area; Balcony /Deck Area: Cool Roof: N/A 339.61 People Associated wKh Project: 1117 COUNTRY CLUB LNEABCDE11142952 CORONA.CA 92878 1117 Country Club Ln Corona,CA 928783628 2170 WHITMAN WAY Contractor Permit Applicant Owner JAY'S ROOFING Jay Moreau CENDEJAS.CONSTANTINO III Mechanical Fixtures QtyQtyTypeQtyPlumbingFixturesTypeElectricalFixtures The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit Is required to commence or continue work. FINAL INSPECTIONS DATE INSPECTORCityofAnaheim Building Division AM applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765>4280 Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126 INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041 Do not pour concrete until the following applicable items have been signed;Fire Dept.Final (714)765-5041 Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591 Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer Setback/Forms/Trenches (Footings)COA/Migation Measures Do not install subfloor or pour floor slab until the foilwing applicable items have been signed: Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Fxn^Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building InspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been sinned: 1st Floor Shear Mechanical InspectionsFiresprlnkler(Rough)(Fire Dept.) 2nd FJgo^SliBaL^. R^f(SheatiTip§/P?aphragm/Frame) ^MaSom^[Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagatlon Measures Framing (Only after Plbg.,Ele.,Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &Plbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New Construction Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor 'Do IK»I sicmfid off Sewer Water Engineering Backflow (Testable Only) Water Service