1639 W. CATALPA DRPermit Types CITY OF ANAHEIMPLMELEMECBLD
X BUILDING DIVISION
200 S.ANAHEIM BLVD.
(714)765-5153
Permit Number:BLD2023-02386
Issued:05/16/2023
www.anaheim.net/building
(714)765-4626
Quarter Section:52
Site Address:1639 W CATALPA DR,ANAHEIM.CA 92801
Legal Description:N TR 3372 BLK LOT 5
APN:03447203
Project Description:Re-roof:cover existing and install (28)sq.of composition shingles on entire house.
13,900.002Valuation;
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit:
Number of Stories:Living Area:
Garage Area;
Carport Area;
Balcony /Deck Area:
Cool Roof:
N/A
339.61
People Associated wKh Project:
1117 COUNTRY CLUB LNEABCDE11142952 CORONA.CA 92878
1117 Country Club Ln Corona,CA 928783628
2170 WHITMAN WAY
Contractor
Permit Applicant
Owner
JAY'S ROOFING
Jay Moreau
CENDEJAS.CONSTANTINO III
Mechanical Fixtures QtyQtyTypeQtyPlumbingFixturesTypeElectricalFixtures
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit Is required to commence or continue work.
FINAL INSPECTIONS DATE INSPECTORCityofAnaheim
Building Division
AM applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765>4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
INSPECTION DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041
Do not pour concrete until the following applicable items have been signed;Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
Setback/Forms/Trenches (Footings)COA/Migation Measures
Do not install subfloor or pour floor slab until the foilwing applicable items have been
signed: Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)
Fxn^Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been sinned:
1st Floor Shear
Mechanical InspectionsFiresprlnkler(Rough)(Fire Dept.)
2nd FJgo^SliBaL^.
R^f(SheatiTip§/P?aphragm/Frame)
^MaSom^[Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagatlon Measures
Framing (Only after Plbg.,Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &Plbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
'Do IK»I sicmfid off
Sewer
Water Engineering Backflow (Testable Only)
Water Service