3302 W. BRADY AVEPermit Types CITY OF ANAHEIMPLMPlDELEMEC
■X X BUILDING DIVISION
200 S.ANAHEIM BLVO.
(714)765-5153
Permit Number;BLD2022-04286
Issued:11/15/2022
www.anaheim.net/building
(714)765-4626
Quarter Section:7
Site Address:3302 W BRADY AVE,ANAHEIM,CA 92804
Legal Description;N TR 1098 BLK LOT 34 TR 1098 LOT 34 POR OF LOT
APN:07927233
Project Description:Residential Photovoltaic System with Inverters
32,740,43LivingArea:
Garage Area:
Carport Area:
Balcony /Deck Area:
Cool Roof:
Number of Stories:Valuation:
Construction Types:
Occupancy Groups:
Fire Sprinklered:
Total Fees paid for Permit;167.00
People Associated with Project:
Permit Applicant Posese Pulu
Type Electrical Fixtures Qty Type Plumbing Fixtures Qty Mechanical Fixtures Qty
1Meter/Disc Sw ●Under 600 V,up to 200
amps
The permit shall expire by limitation and become null and void If the building or work has not passed final inspection 365 days from the
date of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Plumbing (Ground/Underfloor Drain Waste)Water Engineering (714)765-4591
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Formsrrrenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
sigriPd Building Final (714 765-5153)
Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water)2-
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/Mitagation Measures
Framing (Only after PIbg..Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or plaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct,Ele.,or Mec.)
Grease Interceptor
.n,:,;u;t Ivirkfil
Sewer
jniQ^s v'oned offi
Water Engineering Backflow (Testable Only)
Water Service