Loading...
3127 W. BRIDGEPORT AVEPermit Types CITY OF ANAHEIMPLMMECBLDELE X BUILDING DIVISION 200 S.ANAHEIM BLVD. (714)765 -5153 Permit Number:BLD2023-06455 Issued;12/06/2023 www.anaheim.net/building {714)765-1626 Quarter Section;9 Site Address:3127 W BRIDGEPORT AVE,ANAHEIM,CA 92804 Legal Description;N TR 6163 BLK LOT 12 APN:13537220 Project Description:Electrical for 200amp Main Service 0.001Valuation:Number of Stories:Living Area: Garage Area: Carport Area: Balcony /Deck Area: Cool Roof: N/AConstructionTypes: Occupancy Groups: Fire Spnnklered: Total Fees paid for Permit:172.00 People Associated with Project: 7550 NEWCOMB ST SAN BERNARDINO,CAContractor Permit Applicant Owner ROBERTO RIVERA Roberto Rivera NGUYEN,DANNY 3127 W BRIDGEPORT Mechanical Fixtures QtyQtyQtyTypePlumbingFixturesTypeElectricalFixtures 1Meter/Disc Sw -Under 600 V,up to 200 amps The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the date of permit issuance.A new permit is required to commence or continue work. DATE INSPECTORFINALINSPECTIONS City of Anaheim Building Division All applicable items below must be signed before utilities are released Final Gas Test Electrical Final Plumbing Final Mechanical Final Cross Connection Control (714)765-4280 Do not occLiov this building until the final inspections have been made.Engineering Final (714)765-5126 DATE INSPECTOR Fire Sprinkler (ONLY)(714)765-5041INSPECTION Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041 Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste) Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer COA/Migation MeasuresSetback/Forms/Trenches (Footings) Do not install subfloor or pour floor slab until the foilwing applicable items have been Sinned Building Final (714 765-5153) Last Inspection-Final Only After Above CompletedPlumbing(Ground/Underfloor Water) Underfloor Rough Gas PARTIAL INSPECTIONSMechanical(Groundwork) Building inspectionsElectrical(Underground Conduit) Pre-slab (Compaction/Membrane Reinf.) Floor (Joist/Girders) Underfloor Insulation (Raised Foundation Only) Floor Nailing (Raised Foundation Only) 2nd Floor (Floor Nailing) Do not cover or conceal the work below until the following applicable items have been signed- 1st Floor Shear Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.) 2nd Floor Shear Roof (Sheathing/Diaphragm/Frame) Masonry (Reinf./Bond Beam/Pre-Grout) Rough Plumbing (Top Out) Rough Duct (Mechanical) Rough Mechanical Rough Electrical Plumbing InspectionsRoughCOA/Mitagation Measures Framing (Only after PIbg.,Ele..Mec.&Fire) Insulation (Sound/Energy) Do not tape or plaster until the following applicable items have been signed: Drywall Drywall Penetrations (Ele,Mec &PIbg) Interior Lath Electrical InspectionsExteriorLath Electrical Service Meter-(Meter will be set within 2-3 business days after approval)Excludes New gflnslriistiQn Exterior Plaster (Brown Coat) T-Bar (Struct.,Ele.,or Mec.) Grease Interceptor (Dq nol backlill unless siuned oiti Sewer Water Engineering Backflow (Testable Only) Water Service