Permit Number;BLD2023-03418
Issued:07/11/2023
www.anaheim.net/building
(714)765-4626
Quarter Section:43
Site Address:1751 S GARDEN DR,Anaheim,CA 92804
Legal Description:N TR 1931 BLK LOT 6
APN:12860215
Project Description:Plumbing for repipe using ABS for bathroom,kitchen and laundry room
Number of Stories:1LivingArea:
Garage Area:
Carport Area:
Balcony /Deck Area:
Valuation:0.00
Construction Types:
Occupancy Groups:
Fire Spnnklered:
Total Fees paid for Permit:
N/A
Cool Roof:167.00
People Associated with Project:
3150 E BIRCH ST200205291032294650 BREA.CA 92821Contractor
Permit Applicant
Owner
SERVICE CHAMPIONS PLUMBING HEATING &
Lalauni Brimacomb
BURNETTE.ROBERTA A TR R 1751 S GARDEN DR
Type Qty TypeElectricalFixtures Plumbing Fixtures Qty Mechanical Fixtures Qty
Repair/Drainage Alleration/Vent Piping
The permit shall expire by limitation and become null and void if the building or work has not passed final inspection 365 days from the
dale of permit issuance.A new permit is required to commence or continue work.
DATE INSPECTORFINALINSPECTIONS
City of Anaheim
Building Division
All applicable items below must be signed before utilities are released
Final Gas Test
Electrical Final
Plumbing Final
Mechanical Final
Cross Connection Control (714)765-4280
Do not occupy this building until the final inspections have been made.Engineering Final (714)765-5126
Fire Sprinkler (ONLY)(714)765-5041DATEINSPECTORINSPECTION
Do not pour concrete until the following applicable items have been signed:Fire Dept.Final (714)765-5041
Water Engineering (714)765-4591Plumbing(Ground/Underfloor Drain Waste)
Sub List/Bus.Lie.(714)765-5194 (Allow 10 business days)Electrical Ground Electrode/Ufer
COA/Migation MeasuresSetback/Forms/Trenches (Footings)
Do not install subfloor or pour floor slab until the follwing applicable items have been
sioned , Building Final (714 765-5153)
Last Inspection-Final Only After Above Completed ●7-Z.3Plumbing(Ground/Underfloor Water)
Underfloor Rough Gas
PARTIAL INSPECTIONSMechanical(Groundwork)
Building InspectionsElectrical(Underground Conduit)
Pre-slab (Compaction/Membrane Reinf.)rtu
Floor (Joist/Girders)
Underfloor Insulation (Raised Foundation Only)
Floor Nailing (Raised Foundation Only)
2nd Floor (Floor Nailing)
Do not cover or conceal the work below until the following applicable items have
been signed:
1st Floor Shear
Mechanical InspectionsFiresprinkler(Rough)(Fire Dept.)
2nd Floor Shear
Roof (Sheathing/Diaphragm/Frame)
Masonry (Reinf./Bond Beam/Pre-Grout)
Rough Plumbing (Top Out)i.
Rough Duct (Mechanical)
Rough Mechanical
Rough Electrical
Plumbing InspectionsRoughCOA/MItagation Measures
Framing (Only after PIbg..Ele.,Mec.&Fire)
Insulation (Sound/Energy)
Do not tape or piaster until the following applicable items have been signed:
Drywall
Drywall Penetrations (Ele,Mec &PIbg)
Interior Lath
Electrical InspectionsExteriorLath
Electrical Service Meter-(Meter will be set within 2-3
business days after approval)Excludes New
Construction
Exterior Plaster (Brown Coat)
T-Bar (Struct.,Ele.,or Mec.)
Grease Interceptor
(Do not backfill unless signed off
Sewer
Water Engineering Backflow (Testable Only)
Water Service